14.08.2013 Views

Haddockston Golf Course Extension EIA Scoping Report

Haddockston Golf Course Extension EIA Scoping Report

Haddockston Golf Course Extension EIA Scoping Report

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

there is a significant possibility of significant harm being caused; or<br />

significant pollution of controlled waters is being caused or there is a significant possibility of such pollution being<br />

caused.<br />

7.3 PROPOSED ASSESSMENT METHODOLOGY<br />

7.3.1 It is proposed to undertake a desk study appraisal of available information, in order to establish the status<br />

and condition of geological resources at the site, and the location and type of any soil contamination. Consideration of<br />

groundwater quality and soil permeability in relation to drainage requirements will be included in the assessment of<br />

hydrology and drainage, as discussed further in Chapter 11.<br />

7.3.2 Baseline information will be obtained from geological plans and borehole logs held by the British Geological<br />

Society (BGS), Soil and Land Capability for Agriculture maps produced by the Macaulay Institute and the results of<br />

any ground investigation reports where available. The location and extent of any geologically important sites will be<br />

obtained from SNH, the Local Authority and local interest groups. A review of relevant historical map extracts will be<br />

undertaken to identify any potentially contaminative former land uses. An Envirocheck report will also be obtained to<br />

provide pertinent information on current potentially contaminative land uses. This review will be supported by<br />

consultation with SEPA and Renfrewshire Council’s Environmental Health Officer to confirm any known or potential<br />

areas of contamination.<br />

7.3.3 The information gathered during this exercise will be assessed to determine the sensitivity of the geological<br />

resources at the site and the likely pollutant linkages to arise as a result of the development.<br />

7.3.4 The ES will consider the potential impacts of the construction and operation (including indirect impacts) on<br />

the quality of the geological resources identified and the potential for mobilisation and movement of contaminants<br />

where identified.<br />

7.3.5 The need for mitigation measures to be implemented at the site during these phases will be considered and<br />

the significance of any identified residual effects will be assessed.<br />

7.4 KEY ISSUES FOR CONSIDERATION IN THE <strong>EIA</strong><br />

Construction<br />

Risk of soil erosion due to construction works.<br />

Risk of contaminant exposure and mobilisation arising from the construction works.<br />

Contamination of geological resources due to poor construction site management practices.<br />

Identification of appropriate construction best practice.<br />

Generation, on-site storage and treatment of potentially contaminated waste arisings.<br />

Operation<br />

Exposure of future users and nearby sensitive receptors to any residual contaminants.<br />

Loss of structure of superficial deposits due to compaction or erosion.<br />

12151856-001 <strong>Haddockston</strong> <strong>Golf</strong> <strong>Course</strong> <strong>Extension</strong> 19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!