Page-7<br />

3.20.10 In <strong>the</strong> event <strong>of</strong> loss or <strong>the</strong>ft <strong>of</strong> <strong>the</strong> machinery or any <strong>of</strong> its components in part or full when it stands issued to <strong>the</strong> contractor,<br />

NOT APPLICABLE <strong>the</strong> value <strong>of</strong> such lost articles will be recovered from <strong>the</strong> contractor at <strong>the</strong> price fixed by <strong>the</strong> S.E or<br />

E.E concerned.<br />

3.21 CLAIM NOT ADMISSIBLE under following circumstances :-<br />

a) Extra items <strong>of</strong> work done without written order <strong>of</strong> competent departmental <strong>of</strong>ficer.<br />

b) In case <strong>of</strong> sudden fluctuation and / or increase in rates <strong>of</strong> labour, materials, royalty, various taxes, railway freight, fuel,<br />

lubricants, carriage cost etc. at any stage <strong>of</strong> <strong>the</strong> work<br />

c) Short supply and / or non-supply and / or delay in supply <strong>of</strong> departmental materials and / or equipments.<br />

d) Non-availability <strong>of</strong> labour <strong>of</strong> any category required <strong>for</strong> <strong>the</strong> work.<br />

e) Labour sitting idle due to any reason / cases.<br />

f) Delay in communication regarding any charges or modification in design, drawing, specification, alteration & addition etc.<br />

g) Loss sustained due to :-<br />

1) Acts <strong>of</strong> enemies including agitation by Public and Riot.<br />

2) Transportation and Procurement difficulties.<br />

3) Natural Calamities.<br />

4) Any o<strong>the</strong>r circumstances out <strong>of</strong> bound <strong>of</strong> human control.<br />

h) Iron materials not issued in required length.<br />

3.22 In case Bulk Bitumen is issued by <strong>the</strong> department to <strong>the</strong> agency, no extra cost will be paid on account <strong>of</strong> lifting bulk<br />

bitumen from departmental godown in drums, empty <strong>the</strong>m and carriage <strong>of</strong> <strong>the</strong> same from <strong>the</strong> R.C.D godown to <strong>the</strong> site <strong>of</strong><br />

work and <strong>the</strong>se operations will have to be done by <strong>the</strong> contractor at his own cost.<br />

3.23 Proportionate deduction shall be made from <strong>the</strong> bill <strong>of</strong> <strong>the</strong> contractors <strong>for</strong> less leads <strong>of</strong> stone aggregates and moorum from<br />

<strong>the</strong>ir sources <strong>of</strong> actual receipt in comparison to those provided in <strong>the</strong> B.O.Q, but no extra payment will be made <strong>for</strong> more<br />

leads if any actually involved.<br />

3.24 Extension <strong>of</strong> time, if justified, may be granted by <strong>the</strong> different competent <strong>of</strong>ficers <strong>for</strong> different periods <strong>of</strong> time, <strong>for</strong> different<br />

types and values <strong>of</strong> works as noted below, o<strong>the</strong>rwise penalty <strong>for</strong> non-fulfillment <strong>of</strong> <strong>the</strong> contract may be imposed, after<br />

giving due consideration <strong>for</strong> poor progress at different stages <strong>of</strong> works without valid and satisfactory reasons. More<br />

payments <strong>of</strong> running account bills, keeping back certain amount <strong>for</strong> non-extension <strong>of</strong> time, does not qualify as a valid<br />

ground <strong>for</strong> grant <strong>of</strong> Extension <strong>of</strong> time as a matter <strong>of</strong> right. The Officer granting such extension <strong>of</strong> time has <strong>the</strong> full liberty to<br />

weight & examine <strong>the</strong> circumstances which led to such requirement <strong>for</strong> fulfillment <strong>of</strong> contract, and use his own discretion<br />

<strong>for</strong> passing final orders, which shall be treated as final and shall be binding and conclusive <strong>for</strong> <strong>the</strong> contractor.<br />

1. Executive Engineer i) Up to Any period <strong>for</strong> <strong>Repair</strong> Works.<br />

RCD,<strong>Road</strong> Division,Ranchi.ii) For Any period <strong>for</strong> Original works valued up to Rs.10,000/-<br />

iii) Up to 50 % above <strong>the</strong> contract period <strong>for</strong> original work valued between Rs.10,000/- to<br />

50,000/-<br />

2. Superintending Engineer i) Up to Any period <strong>for</strong> Original Works <strong>of</strong> value between Rs.10 to 50 thousand.<br />

RCD,<strong>Road</strong> Circle,Ranchi ii) Up to 100 % above <strong>the</strong> contracted period <strong>for</strong> <strong>the</strong> original work <strong>of</strong> value between<br />

50,000/- to 50 lakhs.<br />

3. Chief Engineer( Com. ) i) Up to Any o<strong>the</strong>r period <strong>for</strong> work up to Rs.5 Lacs.<br />

RCD, Jharkhand, ,Ranchi. ii) 100 % above <strong>the</strong> contracted period in case <strong>of</strong> Original Works <strong>of</strong> 5 lakh to 10 lac<br />

iii) For granting extension beyond 100 % <strong>of</strong> time <strong>of</strong><br />

completion in respect <strong>of</strong> work <strong>of</strong> <strong>the</strong> value between Rs. 5 Lacs & Rs.10 Lacs and <strong>for</strong> any extension to Rs. 5 Lacs &<br />

Rs.10 Lacs and <strong>for</strong> any extension to work <strong>of</strong> value above Rs. 10 Lacs,<strong>the</strong> Chief Engr will grant extension<br />

after bringing into <strong>the</strong> notice <strong>of</strong> <strong>the</strong> Government.<br />

3.25 The contractor shall, if required by <strong>the</strong> E/I arrange to test materials at site or get <strong>the</strong>m tested in recognised departmental<br />

testing laboratories at his own cost in order to prove <strong>the</strong>ir soundness and sufficiency as per specifications laid down. The<br />

number <strong>of</strong> tests required <strong>for</strong> different items will be specified by <strong>the</strong> E/I.<br />

3.26 The estimated output <strong>of</strong> <strong>the</strong> roller <strong>for</strong> 8 hours working is as follows :-<br />

Compaction <strong>of</strong> Moorum / Gravel. 566.00 m3<br />

Compaction <strong>of</strong> Earth Work. 566.00 m3<br />

Consolidation <strong>of</strong> Grade – I 25.00 m3<br />

Consolidation <strong>of</strong> Grade – II 25.00 m3<br />

Consolidation <strong>of</strong> Grade – III 25.00 m3<br />

20 mm thick Pre-mixing 500.00 m2<br />

Surface Dressing. 650.00 m2<br />

3.27 The Contractor will have to give an affidavit <strong>for</strong> <strong>the</strong> Hot Mix Plant and o<strong>the</strong>r equipments shown as credential will be<br />

deployed <strong>for</strong> completion <strong>of</strong> this specific work on top most priority basis.<br />

3.28 (i) In case <strong>of</strong> <strong>the</strong> rate <strong>of</strong> tender is accepted above <strong>the</strong> B.O.Q. rate by <strong>the</strong> competent authority, <strong>the</strong><br />

enhanced% <strong>of</strong> rate shall not be applicable over <strong>the</strong> cost <strong>of</strong> bitumen.<br />

(ii) In case <strong>of</strong> rate quoted by <strong>the</strong> Agency is less than <strong>the</strong> B.O.Q. rate <strong>the</strong>n <strong>the</strong> less% <strong>of</strong> rate shall be<br />

applicable on <strong>the</strong> cost <strong>of</strong> bitumen also.<br />