PG&E’s Emerging Technologies Program <strong>ET</strong>11<strong>PGE</strong>3171<br />

PILOT SITE #1<br />

LOCATION AND SITE INFORMATION:<br />

Oakland, CA 94607<br />

Mixed office, court, and vacant holding cells<br />

100,000 sq ft, 4 stories<br />

CEC Climate Zone 3<br />

M-F, 4am to 6pm operation<br />

Annual kWh usage: 648,500<br />

Annual therms usage: 45,000<br />

Installed 42 WPT units (Manufacturer 1)<br />

MECHANICAL SYSTEMS:<br />

Cooling Source: 220-ton chiller<br />

Heating Source: Steam boiler<br />

Air Distribution: Dual duct, single fan VAV, 1 air handler<br />

Variable dual-damper terminal units<br />

PROJECT INITIATION:<br />

This project started out as part of an Automated Demand Response (ADR) project. The<br />

original objective of the project was to give the customer the ability to shut off load during<br />

demand response events. Although the ADR project costs were covered through PG&E and<br />

DOE incentive programs, the WPT portion of the project was not covered and was,<br />

therefore, paid for by the site.<br />

This site installed 42 WPTs, covering the entire building. The site had ADR controls installed<br />

concurrently with the WPT project.<br />

PLANNED EE MEASURES:<br />

The following list of planned measures is based on discussions that we had with the site<br />

staff before the installation occurred.<br />

Zone-level scheduling<br />

DSP reset<br />

Deadband<br />

Global temperature adjustment, demand response<br />

INSTALLED EE MEASURES<br />

WPT ENABLED<br />

Cold deck supply air temperature (CD SAT) Reset: A secondary input to the CD SAT<br />

was modified to include the average zone temperature from the WPTs. The primary<br />

SAT reset is determined by the outside air temperature in both the baseline and<br />

post-retrofit cases.<br />