PG&E’s Emerging Technologies Program <strong>ET</strong>11<strong>PGE</strong>3171<br />
PILOT SITE #2<br />
LOCATION AND SITE INFORMATION:<br />
Oakland, CA 94612<br />
Multi-tenant office<br />
200,000 sq ft, 9 stories<br />
CEC Climate Zone 3<br />
M-F, 6 am to 6 pm operation<br />
Annual kWh usage: 1,891,000<br />
Annual therms usage: 24,000<br />
Installed 190 WPT units (Manufacturer 1)<br />
MECHANICAL SYSTEMS:<br />
Cooling Source: 100-ton air-cooled chillers, 2 units<br />
Heating Source: 3,280 kBtu/hr hot water boiler<br />
Air Distribution: 80,000 cfm VAV air handlers w/o economizers, 2 units. There is<br />
minimal return air, so the systems are essentially 100% outside air. Fan-powered<br />
boxes along perimeter of building provide additional heating at zone level.<br />
PROJECT INITIATION:<br />
The Oakland Shines program initiated this project and provided an incentive as well as<br />
project management assistance. The project intended to reduce energy consumption.<br />
The site installed 190 WPTs, replacing all of the existing pneumatic thermostats in the<br />
building’s core but left some existing digital thermostats that control perimeter reheat fan<br />
coils. The project scope also included the installation of a new BMS (Johnson Controls<br />
Facility Explorer System) for central systems.<br />
PLANNED EE MEASURES:<br />
The following list of planned measures is based on discussions that we had with the site<br />
staff before the installation occurred.<br />
Shutting down airflow to unoccupied (vacant) zones<br />
SAT reset<br />
DSP reset<br />
Deadband<br />
INSTALLED EE MEASURES<br />
WPT ENABLED<br />
DSP reset based on average zone temperatures only<br />
Cooling stage lockouts<br />