PG&E’s Emerging Technologies Program <strong>ET</strong>11<strong>PGE</strong>3171<br />

INCENTIVES<br />

The site received two incentives for a total incentive amount of $117,189.<br />

Customized Retrofit Incentive: The CRI program savings amounts are listed in the table<br />

below. The CRI program incentive was $26,971.<br />

Table 10: Pilot Site 2 - CRI Program Savings Amounts<br />

Oakland Shines: The savings amounts from the Oakland Shines program are shown in the<br />

table below. The savings amounts were based on spreadsheet calculations. The Oakland<br />

Shines program incentive was $90,218.<br />

Table 11: Pilot Site 2 – Oakland Shines Program Savings Amounts<br />

COMMENTS AND OBSERVATIONS FROM SITE STAFF<br />

The owners are happy with the system. They expect to see savings in reduced<br />

energy bills.<br />

Tenants have found the temperature more consistent. The building management<br />

staff has already noticed receiving less complaint calls, and is able to check<br />

temperatures and operation centrally before going to the problem zone.<br />

The installation process (units on the wall) took longer than they had thought, more<br />

than 2 days per floor.<br />

The installation process generated a punch-list of 40 boxes to check in the building.<br />

This was seen as a benefit to the installation allowing problems to be identified<br />

(although maybe not for the building engineer who has to do the repairs).<br />

Unit installation was estimated at 3 to 4 weeks out of a total project length of 6<br />

weeks to 2 months.<br />

At the time we discussed it with them, the building staff had not addressed having a<br />

controls contractor on a maintenance contract. However, they suspected that they<br />

would use the WPT installation contractor for any future controls work.<br />

They would like to pursue LEED® certification next year.<br />

FUTURE POTENTIAL<br />

kW kWh Therms<br />

CRI Calculated Incentive (PA) 117.00 149,130 1,850<br />

CRI Verified Savings (IR) 174.00 183,180 1,550<br />

kW kWh Therms<br />

Oakland Shines program 133.00 175,063 2,686<br />

This site selected single setpoint thermostats, and it would be cost prohibitive to replace<br />

these with deadband models at any point in the near future. This site could potentially<br />

modify the SAT reset to be based on actual zone temperatures, rather than on average<br />

building temperature.<br />