PG&E’s Emerging Technologies Program <strong>ET</strong>11<strong>PGE</strong>3171<br />

MEASURE SUMMARY TABLE:<br />

The following table shows the measures for this pilot site based on category and at different<br />

project stages.<br />

Table 12: Pilot Site 3 - Measures<br />

Pilot Site 3 Savings potential:<br />

good some little/none<br />

Measures: Scheduling SAT Reset DSP Reset Deadband<br />

Proposed<br />

Installed<br />

WPT<br />

Attributable<br />

FINDINGS<br />

Very fixed office<br />

schedule<br />

Curtailed<br />

morning warm<br />

up.<br />

Curtailed<br />

morning warm<br />

up.<br />

1. The site implemented a deadband, typically 70°F to 75°F. The building<br />

presumably decided on a higher heating setpoint than is typical (70°F vs 68°F)<br />

since they have free heating from their cogeneration microturbines and would not<br />

see realized savings from a lower heating setpoint. In the pre-retrofit case, the<br />

thermostat setpoints were adjustable by the tenants.<br />

2. Scheduling Curtailment of Morning Warm-up. Concurrently with the WPT<br />

installation, the building operations staff adjusted the time at which the HVAC<br />

system is enabled. The central plant schedule was set to a 7am to 6pm<br />

operation. The baseline varied but equipment started as early as 3:30am.<br />

Although the building engineer was able to verify space temperatures from the<br />

WPTs, this measure was not enabled by the WPT installation.<br />

3. A new central system BMS (Tridium Niagara) will be installed in late 2012 or early<br />

2013 and is expected to include DSP reset based on zone information from the<br />

WPTs, and possibly an altered SAT reset based on zone information. The new<br />

system may also address global temperature adjustment.<br />

MEASUREMENT AND VERIFICATION (M&V)<br />

MONITORING PERIODS<br />

Already based on<br />

digital<br />

sensor/floor<br />

N/A<br />

N/A<br />

Yes, may also<br />

replace sensors<br />

Will implement<br />

with planned new<br />

BMS<br />

Will implement<br />

with planned new<br />

BMS<br />

Management<br />

wants to have<br />

control<br />

Yes, 70-75<br />

Yes, 70-75<br />

Pre-WPT retrofit: 3/16/2012 to 4/26/2012<br />

Installation: 8/1/2012 to 10/15/2012<br />

Post-WPT retrofit: 10/16/2012 to 11/5/2012<br />

42<br />

Setpoint<br />

Enforcement<br />

Want to remove<br />

occupant control<br />

Concurrent with<br />

deadband<br />

Concurrent with<br />

deadband<br />

DR: GTA (incl Pre-<br />

Cooling)<br />

Very interested Hope to reduce<br />

service calls<br />

Possibly planned<br />

with new BMS<br />

Possibly planned<br />

with new BMS<br />

RCx Other<br />

Yes, generated a<br />

punchlist<br />

Yes, generated a<br />

punchlist<br />

N/A<br />

N/A<br />

N/A