25.08.2013 Views

Installation and Maintenance Instructions - ETO Doors

Installation and Maintenance Instructions - ETO Doors

Installation and Maintenance Instructions - ETO Doors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

INSTALLATION GUIDE-industiral door<br />

Please Retain This Booklet For Future Reference<br />

Table of Contents<br />

A, introduction <strong>and</strong> preparing<br />

Gerernal information 2<br />

Industrial door installation illustration 3<br />

Bolts <strong>and</strong> nuts 4<br />

Packing components list<br />

B, installing the door<br />

5<br />

SETP 1: Check the related sizes 6<br />

SETP 2: Assembling <strong>and</strong> installing vertical tracks 7<br />

STEP 3: Assembling <strong>and</strong> installing horizontal tracks 7<br />

STEP 4: Align the balance system 8<br />

SETP 5: installing the door sections 9‐10<br />

SETP 6: fasten the cable & fixed drum 11<br />

STEP 7: winding the torsion spring 12<br />

SETP 8: checking & adjusting the door 13<br />

C, troubleshooting 14<br />

D, maintaineance 15<br />

1


A, Read the instructions completely before starting the installation of the door. Becoming familiar with the components<br />

before assembling the door will reduce the installation time.<br />

B, The installation of a garage door is a considerable job which requires knowledge <strong>and</strong> preparation. This is why we highly<br />

recommend you hire someone specialized to do the job. A professional door installer will adjust the door perfectly <strong>and</strong> he<br />

generally guarantees his work.<br />

C, You can obviously do the installation of your garage door yourself as long as:<br />

‐ you have a good deal of experience in do‐it‐yourself projects;<br />

‐ you have the right tools;<br />

‐ you will have help in h<strong>and</strong>ling the panels <strong>and</strong> the pieces of hardware;<br />

‐ you read the instructions in this manual BEFORE starting the installation of the door,not after.<br />

D, The manufacturer cannot be held liable in the event of any damage which could result before while <strong>and</strong> after installing a<br />

garage door. The illustrations in this guide are as precise as possible, slight differences in detail may appear.<br />

E, Make sure the whole door installation process using the original,factory‐supplied sections, parts, <strong>and</strong> hardware installed<br />

in strict accordance with these instructions.<br />

LIST OF TOOLS THAT YOU WILL NEED:<br />

General Information<br />

‐ clamps or locking pliers ‐ a stepladder<br />

‐ screwdrivers ‐ a level<br />

‐ a hammer ‐ a tape measure ‐ a square<br />

‐ a hacksaw ‐ a wood saw ‐ saw horses (with carpet or other soft material on top surface)<br />

‐ drill (1/4", 3/16", & 3/8" bit for optional end stile locks)<br />

‐ a set of socket wrenches, 3/8, 7/16, 1/2 <strong>and</strong> 9/16 socket bits<br />

‐ T‐Square<br />

‐ two steel winding rods<br />

2


Garage door installation:<br />

NO. DESCRIPTION:<br />

A‐G: door panel<br />

H: passing door(optional)<br />

protection vertical<br />

I:<br />

track(L+R)<br />

J: vertical track(L+R)<br />

horizontal double<br />

K: track(L+R)<br />

L: bottom alumium sealing<br />

M: torsion spring<br />

safety device for spring<br />

N: break(optioinal)<br />

O: cable drum (L+R)<br />

safety device for cable<br />

P:<br />

break<br />

Q: adjustable hinges<br />

R: top bracket<br />

S: center hinges<br />

T: spring shaft<br />

3


olts <strong>and</strong> nuts: expansion bolts:<br />

U: nylon roller<br />

V: cable<br />

Y: multi‐hole angles<br />

Z: drum bracket<br />

4


Packing components list:<br />

torsion<br />

springs<br />

panel carton<br />

small<br />

hardwares<br />

carton<br />

tracks<br />

(vertical+<br />

horizontal)<br />

motor carton<br />

optional<br />

5


The backroom distance is<br />

measured from the back<br />

of the door into the<br />

site, <strong>and</strong> should be at<br />

least 18" more than the<br />

height of the industrial<br />

door.<br />

step one:<br />

A minimum side room of 4" should be available on each side of the<br />

door on the interior wall surface to allow for attachment of the<br />

vertical track assembly. The rough opening should be the same size<br />

as the door.<br />

Headroom is the space needed above the top of the<br />

door for the door, the overhead tracks, <strong>and</strong> the<br />

springs. Measure to check that there are no<br />

obstructions within that space,20" headroom<br />

required at least for industiral door.<br />

vertical tracks<br />

Please keep in mind that the clearance<br />

between the door edge <strong>and</strong> the vertical<br />

track inside edge is 20mm-25mm<br />

(each side,grey part).<br />

On the inside of the opening should be framed with wood<br />

jambs, 2" x 6" if possible. The side<br />

jambs should extend to approximately the same height as<br />

the headroom required.<br />

6


I<br />

J<br />

K<br />

step two:<br />

I&J: After checked the aboved<br />

sizes,then install the protection track<br />

I <strong>and</strong> vertical track J accordingly: THE<br />

VERTICAL PROTECTION TRACKS MUST BE<br />

PARRLLEL.In other words,the distance<br />

between the track must be the same at<br />

the top <strong>and</strong> at the bottom. The top of<br />

the vertical tracks must be level as<br />

compared to each other.If possible<br />

please use the gravity dropper to test.<br />

The tops of the vertical tracks must be level with each other.If two vertical<br />

tracks are not level,cut the bottom of one of the tracks or lift the other.<br />

J<br />

I<br />

step three:<br />

K:Align the horizontal trac ks<br />

K with the door header <strong>and</strong><br />

keep exactly the same distance<br />

between the tracks. This<br />

particular point can be<br />

checked by measuring the<br />

diagonals(a=b).<br />

Fasten the curved part of the<br />

horizontal track to the<br />

vertical track J.<br />

b<br />

a<br />

I<br />

K<br />

J<br />

7


step four:<br />

locating the torsion spring M,safety device for spring<br />

break N <strong>and</strong> cable drums O on the spring shaft T as the<br />

picture,the spring shaft T has to be straight <strong>and</strong><br />

level.<br />

K<br />

I<br />

O<br />

Z<br />

T<br />

Z:only locate the cable drum O<br />

between the drum bracket Z above<br />

the vertical track;tighten one<br />

side of spring onto the drum<br />

bracket as the picture<br />

showed.This is the base for the<br />

tension of the springs.<br />

M<br />

M<br />

N(optional):install the safety<br />

device for spring break N with<br />

the torsion spring,this is the<br />

base for the tension of the<br />

winding spring please<br />

check the step seven<br />

below.<br />

N T<br />

8


Keep h<strong>and</strong>s <strong>and</strong> fingers clear of section joints,tracks <strong>and</strong> other door partswhen the door is opening <strong>and</strong> closing to avoid injury.<br />

a<br />

b<br />

Q<br />

P<br />

step five:<br />

P&Q:secure the left bottom<br />

bracket P,adjustable hinge<br />

Q <strong>and</strong> center hinge S with<br />

self drilling screws no.1.<br />

V<br />

U&P:Put the roller U<br />

into the bottom<br />

bracket P of the<br />

bottom panel.hook the<br />

cable V at the same<br />

time.<br />

P<br />

L<br />

U<br />

J<br />

S<br />

d<br />

V<br />

Q<br />

P<br />

U<br />

J<br />

use the balance tools you have to make<br />

sure the bottom panel is balanced.<br />

If necessary, place a wooden<br />

wedge to keep the bottom<br />

panel level<br />

c<br />

after screwed the<br />

adjustable hinge on the<br />

bottom panel,Lift the<br />

bottom panel, ease the<br />

roller U into the<br />

vertical track J.<br />

Please keep in mind that the<br />

clearance between the door edge<br />

<strong>and</strong> the vertical track inside edge<br />

is 20mm-25mm.<br />

9


e<br />

Q<br />

P<br />

W<br />

Always make sure you are<br />

using the proper hinge<br />

for the panel.<br />

Be careful about which<br />

screws you are using.<br />

(See: Where to use<br />

screws <strong>and</strong> nuts)<br />

Repeat the same steps for<br />

the remaining panels.<br />

P<br />

J<br />

I<br />

W(optional): install<br />

safety edge W at the<br />

right or left bottom<br />

corner as you<br />

required position.you<br />

can find the guide in<br />

our packing.<br />

f<br />

P<br />

S<br />

S<br />

S<br />

2 arraies: 3601-4500mm<br />

3 arraies: 4501-5800mm<br />

4 arraies: 5801-7050mm<br />

S:assembling center hinge<br />

with screw no.1(one array<br />

center hing only if the door<br />

width within 3600mm).<br />

make sure the position is in<br />

the center of the door.<br />

X(optional): install the<br />

reinforcement(strut) X if the<br />

door width over 5500mm.<br />

L<br />

X<br />

10


make the cable V go through<br />

between the door <strong>and</strong> the track<br />

J up to the cable drum O. Hook<br />

the end of the cable with a<br />

stop sleeve to the special<br />

notch on the drum O.<br />

O<br />

step six:<br />

Fasten the loop of the<br />

steel cable to its<br />

fastening point on the<br />

bottom panel corner<br />

bracket<br />

a,<br />

b,<br />

V<br />

turn the drum O manually until there<br />

is tension in the cable V, lock them<br />

with the specially designed pressure<br />

screws on the cable drum O.<br />

Repeat this step for the other<br />

cable.<br />

The two sides of the lift cables<br />

must be set equally taut.<br />

O<br />

V<br />

U<br />

K<br />

c,<br />

11


WARNING: WINDING THE TORSION SPRING CALLS<br />

FOR EXTREME CAUTION : CARELESSNESS COULD<br />

LEAD TO SERIOUS INJURIES.<br />

WARNING:THIS PART REQUIRES THE MOST<br />

ATTENTION ON SAFETY.<br />

Loosen the set screws one the<br />

winding cone of the spring,<strong>and</strong> then<br />

using the winding bar(not included)<br />

to wind the spring by truning the<br />

winding cone TOWARD THE CEILING.<br />

The wire must point in the same<br />

direction as you are winding.<br />

N.: Always wind toward the ceiling.<br />

Note: wind the spring 2 ~ 3 turns<br />

first, then make the complete<br />

turns as recommended:<br />

door height 2100mm 6turns<br />

door height 2400mm 7turns<br />

door height 2700mm 8turns<br />

Then tighten the set screws of the<br />

winding cone(add half a turn after<br />

feeling a pressure on the shaft.Do<br />

not forget to tighten the pressure<br />

screw before taking out the winding<br />

bars ).<br />

The winding bars must have the same<br />

diameter as the holes on the<br />

winding cone <strong>and</strong> must be pushed in<br />

as depth as possible into it.<br />

NEVER USE SCREWDRIVERS FOR THIS<br />

STEP.<br />

step seven:<br />

PLEASE MAKE SURE THE DOOR IS IN<br />

CLOSED POSITION.<br />

Remember that each hole on the winding cone is one quarter of a<br />

turn. The number of turns are indicated on the red line affixed<br />

on the spring.<br />

NEVER REMOVE A WINDING BAR OF ITS HOLE UNTIL THE OTHER WINDING<br />

BAR IS IN PLACE AND THAT YOU ARE HOLDING IT FIRMLY. YOU MUST BE<br />

VERY CAREFUL AT THIS POINT.<br />

Once this operation is completed, remove the locking pliers from<br />

the shaft,then only unlock the door, open <strong>and</strong> close the door<br />

slowly manually.You can now check if the door is well-balanced;<br />

ideally, it should stabilize where you stop pushing it up or<br />

pulling it down.<br />

If the door is heavy to lift, increase the torsion spring<br />

tension. If the door goes up too fast, decrease the torsion<br />

spring tension. Add or delete 1/4 turn at a time, alternating<br />

torsion springs. Recheck the balance. Repeat this procedure<br />

until the door rolls smoothly with a satisfactory balance.<br />

12


final checkings:<br />

a,re-adjust torsion spring if necessary,always close the door <strong>and</strong><br />

latch before adjusting.<br />

b,lubricate all moving parts.<br />

step eight:<br />

c,if door doesnot work<br />

easily,double-check the<br />

installation process<br />

especially the step ten &<br />

eleven.<br />

d, make sure spacing of<br />

track is correct <strong>and</strong> that<br />

door is not binding any<br />

place.<br />

balance the door<br />

with the level<br />

13


1, the door becomes very heavy <strong>and</strong> only goes up harfway.<br />

The torsion spring(s) has been installed backwards<br />

2, the door opens very fast <strong>and</strong> is hard to bring back down.<br />

The spring has been wound too much,it is too tight.Adjust the tension according to the type of spring.<br />

3, the door closes fast <strong>and</strong> is hard to lift.<br />

The spring has not been wound enough,it is too loose.Adjust the tension according to the type of spring.<br />

4, the door works well but it goes back up 2 to 3 inches.<br />

The spring is a little too tight.Adjust the tension according to the type of spring.<br />

5, the door is hard to open at first.<br />

The weatherstripping is too tight.Loosen it <strong>and</strong> place it a little farther from the door(the base of the<br />

weatherstripping should be at about 1/2” from the door)<br />

6, the door is hard to open at the end.<br />

The horizontal tracks are not perpendicular with the axis of the door.Use a tape measure to check this.<br />

7, the top panel does not close completely.<br />

Adjust the position of the upper brackets.<br />

Troubleshooting<br />

8, The door slanting as it moves:<br />

The cable tightness of the two sides of the door is not the same --- Readjust the winding drum<br />

9, louder noise as door moving:<br />

a, Hardware is not fully tightened --- Fully tighten them<br />

b, The curved power arm of the motor is not aligned with the door center --- Adjust the arm to align it with<br />

the door center line<br />

c, The two side tracks are not parallel to each other --- Adjust level, vertical tracks to keep them<br />

d, Didn’t lubricate the hinges <strong>and</strong> the winding drum --- Lubricate the hinges <strong>and</strong> the winding drum<br />

14


Maintaineance<br />

A, The door - clean door surface with a mild household detergent(as you would use for your car) with the brush.<br />

Thoroughly rinse the surface with a garden hose. Avoid abrasive cleaners(ex.:Spic’n’ Span) or strong liquid soaps.<br />

B, Weatherstripping – The weatherstripping is make of quality P.V.C. rubber <strong>and</strong> therefore should be cleaned with an<br />

all-purpose vinyl cleanser,Lubricate the weatherstripping every 2 months(more frequently for high usage door) with a<br />

silicon-based oil. Don’t use petroleum-based oils as this will cause loss of elasticity.Petroleum attacks the<br />

rubber <strong>and</strong> decreases its flexibility.<br />

C, Track,hinges,rollers – Lubricated the rollers(Do not lubricate nylon rollers) <strong>and</strong> hinges with a small amount of<br />

light household oil.For the track,use a small amount of grease (as you would use for your car).removing the old grease<br />

with a rag.Apply this grease primarily in the curve of the track.Using grease will result in the quieter operation<br />

of your door(as both the rollers <strong>and</strong> track are steel). To replace bent hinge(s) or broken roller(s). No more than<br />

1 hinge is to be removed from the door at any given time.<br />

D, Automatic door opener – Lightly lubricate with the light household oil.Carefully read the instructions<br />

provided by the manufacturer.<br />

E, Open <strong>and</strong> close the door manually once a month to check the balance system <strong>and</strong> if non-smooth move occurs.<br />

Please invite the qualified maintenance staff to repair it immediately when you find any problem.<br />

F, Warning – Every 3months disconnect the opener(pull the cord) <strong>and</strong> open the door by h<strong>and</strong> several times.If you have<br />

dificulty opening the door,your opener will have the same difficulty. We suggest don't attempt to make repaires on<br />

your garage door without the assistance of a qualified professional door techinican.<br />

G, For your security – The spring assembly,the hardware attached to it <strong>and</strong> the cables are under extreme tension.<br />

Never attempt to loosen them unless all tension is first removed from springs. Always call your door dealer.<br />

15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!