28.08.2013 Views

Download - Fagor Industrial

Download - Fagor Industrial

Download - Fagor Industrial

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FAGORNEWS 2013 TOGETHER WE EVOLVE FAGORNEWS 2013<br />

TOGETHER WE EVOLVE<br />

NEWS<br />

FAGOR INDUSTRIAL FITS KITCHEN IN THE<br />

HOTEL GOLF ALMERIMAR IN ALMERIA<br />

ALMERIA, SPAIN<br />

A hotel with 112 rooms, a spa or a wellness<br />

centre where guests can enjoy a<br />

massage, and a hairdresser’s or beauty<br />

saloon already has good reason to attract<br />

visitors. But equally important is<br />

the quality of the cuisine. This starts<br />

with a good kitchen equipped with<br />

the latest technology, such as that installed<br />

by <strong>Fagor</strong> <strong>Industrial</strong> in the Hotel<br />

Golf Almerimar in Almería. The kitchen<br />

is more than 300 square metres in area<br />

and serves the buffet restaurant, the<br />

international bistro and the Casa Club<br />

de Golf restaurant, with a menu based<br />

on Mediterranean cuisine and seasonal<br />

products.<br />

The hotel kitchens were fitted out from<br />

scratch. “This was previously a four-star hotel,<br />

but it has been completed remodelled,<br />

all of the former hotel has been demolished<br />

and a five-star hotel has been constructed<br />

on the site of the former hotel”, recalls Miguel<br />

Tamura, director general of the Hotel Golf<br />

Almerimar. As a result since 1 December<br />

2012 the resort has had an “avant-garde<br />

kitchen equipped with the latest instruments<br />

to facilitate the cooking for the three different<br />

restaurant areas”, continues the director.<br />

The project managers were Tecnisur Hostelería,<br />

who fitted out the 300 square metre<br />

kitchen with the latest technology from<br />

<strong>Fagor</strong> <strong>Industrial</strong>. “We installed everything”,<br />

recalls Josetxo, manager at Tecnisur. “From<br />

chimneys, extractor hoods, cookers, cold<br />

chambers and stainless steel equipment to<br />

chill blasters, hotplate benches wash sta-<br />

tions, sinks, shelving and auxiliary machinery,<br />

including packing and slicing machines”.<br />

The hotel’s Lobby Bar was also completely<br />

fitted out with a fridge, extractor hoods and<br />

dishwasher.<br />

Josetxo, in charge of distribution for <strong>Fagor</strong><br />

in Vitoria before transferring to Almería, is<br />

considered as a “lifelong” faithful distributor<br />

of the brand. This is why he knows what he<br />

is doing. While the kitchen, which supplies<br />

the three restaurants in the hotel, was being<br />

built, Tecnisur acted as consultants and<br />

recommended improvements. “They even<br />

met the kitchen management to find out their<br />

needs first-hand”, recalls Tamura. This enabled<br />

them to establish the need for a salad<br />

station, a cold room, a robot coupé (stateof-the-art<br />

slicing machine) and an electric<br />

salamander oven to give the final touch to<br />

dishes.<br />

“The kitchen<br />

planned by <strong>Fagor</strong><br />

<strong>Industrial</strong> is very<br />

well-designed,<br />

and is open, clean<br />

and tidy” says the<br />

director general of<br />

the hotel.<br />

One of the features of the Hotel Golf<br />

Almerimar are the lounges, with a capacity<br />

of up to 400 people. Therefore, the kitchen<br />

staff need systems that allow them to optimise<br />

the preparation of menus in large quantities,<br />

for example for wedding banquets.<br />

Therefore, “the kitchen was fitted with high<br />

technology ovens that perfectly complement<br />

the cold systems. We also provided<br />

eight trolleys with a capacity of 110 plates”,<br />

explains Josetxo. This means that, “with 15<br />

people working in the kitchen it is possible to<br />

serve up to 500 meals at the same time in<br />

buffet and banquet mode”.<br />

This, combined with the show cooking and<br />

self-supporting islands make the <strong>Fagor</strong> <strong>Industrial</strong><br />

installation an example of a job welldone.<br />

In short, the director general highlights,<br />

this is a five-star installation which is<br />

”very well designed, open, clean and tidy”<br />

as the only hotel of its category built in Andalucia<br />

in 2012, and which was opened on<br />

1 December after two years of renovations.<br />

22 #11 / JUNE 2013<br />

#11 / JUNE 2013<br />

23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!