SRK Consulting<br />

<strong>Staatsolie</strong> Refinery Draft EIA Report: Non-technical Summary Page xii<br />

# Impact Significance rating Key mitigation/optimisation measures<br />

WR4<br />

WR5<br />

TE1<br />

Potential contamination of the Suriname<br />

River through a large, uncontrolled<br />

release of pollutants during the<br />

operations phase.<br />

Potential contamination of groundwater<br />

resources<br />

Potential contamination of vegetation /<br />

habitat<br />

Before mitigation/<br />

optimisation<br />

After mitigation/<br />

optimisation<br />

Low Very Low<br />

Low Insignificant<br />

Low Very Low<br />

TE2 Potential impact on terrestrial fauna. Very Low Very Low<br />

AE1<br />

AE2<br />

Potential loss of aquatic diversity due to<br />

increased sedimentation / turbidity during<br />

the construction phase<br />

Potential loss of aquatic diversity due to<br />

toxicological effects as result of small<br />

continuous releases of pollutants<br />

Potential loss of aquatic diversity due to<br />

toxicological effects as result of large,<br />

accidental release of pollutants<br />

Ensure adequate spill response measures are included in the Emergency Response Plan.<br />

Ensure adequate spill containment and response equipment are available, including oil booms and oil<br />

spill dispersants.<br />

Regularly maintain all equipment to prevent failures of pipelines, etc.<br />

Ensure all on site staff are trained in the requirements of the Emergency Response Plan and in the use of<br />

spill containment and response equipment.<br />

Ensure all safety precautions are taken during loading and off-loading of potential contaminants.<br />

Develop (or maintain and adapt) procedures for the safe transport, handling and storage of potential<br />

pollutants.<br />

Locate hazardous material storage facilities, especially fuel storage, as far as practically possible from<br />

the Suriname River.<br />

Design and construct hazardous material storage facilities with suitable impermeable materials and a<br />

minimum 110% containment capacity.<br />

Ensure all on site staff are trained in the use of spill prevention measures.<br />

Clean up any spills immediately, through containment and removal of free product and appropriate<br />

rehabilitation or disposal of contaminated soils.<br />

Implement an ongoing and comprehensive water and effluent quality monitoring programme with<br />

regular reporting of monitoring results to NIMOS.<br />

Limit the footprint of construction activities, including laydown areas.<br />

Implement mitigation measures to reduce the potential impact of soil and water contamination.<br />

Implement mitigation measures to reduce the potential impact on air quality.<br />

Limit the footprint of construction activities, including laydown areas.<br />

Implement mitigation measures to limit the potential contamination of vegetation/habitat.<br />

Implement mitigation measures to minimise noise impacts.<br />

Very Low Very Low Implement mitigation measures to reduce the potential impacts on surface water quality.<br />

Low Very Low Implement mitigation measures to reduce the potential impact of soil and water contamination.<br />

Low Very Low Implement mitigation measures to reduce the potential impact of soil and water contamination.<br />

FOUD/dalc 398251_<strong>Staatsolie</strong>_Draft EIR_Non-technical Summary FINAL.doc November 2009