24.09.2013 Views

English - Staatsolie

English - Staatsolie

English - Staatsolie

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SRK Consulting<br />

<strong>Staatsolie</strong> Refinery Draft EIA Report: Non-technical Summary Page ix<br />

Table 2: Summary of potential impacts of the proposed refinery expansion project.<br />

Potential negative impacts are shaded in orange, benefits are shaded in green. White indicates a neutral impact.<br />

# Impact Significance rating Key mitigation/optimisation measures<br />

BIOPHYSICAL IMPACTS<br />

G1<br />

G2<br />

Potential contamination of soil resources<br />

as a result of small leaks and spills<br />

Potential contamination of soil resources<br />

as a result of a large, accidental release<br />

during the operations phase<br />

Altered landscape (visual quality and<br />

sense of place)<br />

Before mitigation/<br />

optimisation<br />

After mitigation/<br />

optimisation<br />

Low Insignificant<br />

Medium Very Low<br />

Low Low<br />

G3 Impact on land use Low Low<br />

Undertake regular maintenance of vehicles and machinery to identify and repair minor leaks.<br />

Develop (or maintain and adapt) procedures for the safe transport, handling and storage of potential<br />

pollutants.<br />

Use spill prevention measures such as drip trays during refuelling, bunds around storage tanks, etc. to<br />

capture spills and contain any leaks.<br />

Ensure all on site staff are trained in the use of spill prevention measures.<br />

Clean up any spills (including existing spills) immediately, through containment and removal of free<br />

product and appropriate rehabilitation or disposal of contaminated soils.<br />

Ensure adequate spill response measures are included in the Emergency Response Plan.<br />

Regularly inspect and maintain all equipment to prevent equipment failures.<br />

Ensure all on site staff are trained in the requirements of the Emergency Response Plan.<br />

Avoid overloading of storage tanks and vehicles during refuelling and ensure all drivers observe the rules<br />

of the road.<br />

Clean up any spills immediately, through containment and removal of free product and appropriate<br />

rehabilitation or disposal of contaminated soils.<br />

Establish or retain as much vegetation as possible around the perimeter of the expanded refinery to act<br />

as a visual screen between project activities and nearby visual receptors.<br />

Implement mitigation measures to reduce the potential air quality impacts.<br />

Establish or retain as much vegetation as possible around the perimeter of the expanded refinery to act<br />

as a visual screen between project activities and nearby visual receptors.<br />

Implement mitigation measures to reduce the potential noise and air quality impacts.<br />

FOUD/dalc 398251_<strong>Staatsolie</strong>_Draft EIR_Non-technical Summary FINAL.doc November 2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!