Town of Banff Local <strong>Action</strong> <strong>Plan</strong><br />

5 Program Implementation Strategy<br />

5.1 Introduction<br />

This section provides a recommended strategy for the Town to implement the LAP. Information<br />

is provided on:<br />

• Program delivery and resource requirements;<br />

• Implementation risk management;<br />

• A performance measurement framework;<br />

• Reporting; and<br />

• On-going stakeholder engagement.<br />

5.2 Program Delivery<br />

As mentioned in the previous section, the various initiatives in the LAP will be delivered in four<br />

key program areas:<br />

• Go for Green<br />

• Alternative Fuels and Green Energy<br />

• Energy Saver Buildings<br />

• Energy Efficiency Education and Services<br />

Delivery details for each of these programs are outlined in the following pages. Specifically, the<br />

following information is provided for each program area:<br />

• A brief description<br />

• A summary of program objectives<br />

• A list of program components (more detail on each of the components is provided in<br />

Appendix 1).<br />

• A proposed timeline, and<br />

Capital costs & resource requirements (cost estimates for resource requirements are also<br />

estimated 14 ).<br />

14 Resourcing costs are estimated by assuming that program staff involved in carrying out these tasks will either be<br />

coordinators or managers, with average annual salaries of $35,000 and $50,000 respectively).<br />

The Sheltair Group Page 22<br />

Sept 2003