Town of Banff Local <strong>Action</strong> <strong>Plan</strong><br />

Capital/Development Costs: 15<br />

Establishing a Vanpool for Town Staff<br />

• If the Town used an existing vehicle or arranged to lease a van, the investments would be low, but if the<br />

Town elects to purchase a new van the investment would be high.<br />

• Establishing the vanpool would likely require allocation of 10% of a full-time coordinator position for one<br />

month, (at an approximate cost of $360 for start-up).<br />

Developing & Promoting Park & Ride Facilities<br />

• Promotion costs should be shared among partnering agencies and incorporated into existing budgets.<br />

Parking lot and signage costs would be included in the construction of two Park and Ride facilities at a<br />

total cost of around $400,000.<br />

• 30% of a full-time manager position would be required for a six month period (at an approximate cost of<br />

$11,000).<br />

Making the Community More Bike and Pedestrian Friendly<br />

• The total cost of completing a cycling network will depend on the number of kilometres and types of<br />

facilities that are included. Costs for the signage could be around $4,000 to $6,000 per kilometre. Costs<br />

for developing a multi-user trail or pathway, excluding land costs, would be in the range of $300,000 to<br />

$850,000 per kilometre depending on width, surfacing, and topography considerations.<br />

• Ancillary costs for bike racks, preparing and producing maps, and information for kiosks would be<br />

medium to low.<br />

• The bike and walk trail system would require the dedication of about 30% of a full-time manager position<br />

for a one-to-two-year period (at an approximate cost of $18,000 -$36,000).<br />

Ongoing/Operational Costs:<br />

Establishing a Vanpool for Town Staff<br />

• There would be no ongoing operational expenses associated with establishing the vanpool program, and<br />

ongoing human resourcing costs would also be negligible.<br />

Developing & Promoting Park & Ride Facilities<br />

• There would be ongoing operational costs associated with maintaining the lots of around $10,000 pa.<br />

• On-going resourcing requirements would be minimal and could be incorporated into existing<br />

responsibilities.<br />

Making the Community More Bike and Pedestrian Friendly<br />

• On-going maintenance costs would be medium, and on-going staffing costs would be minimal.<br />

15 Resourcing costs (staffing requirements) are estimated by assuming that program staff involved in carrying out these tasks will either be<br />

coordinators or managers, with average annual salaries of $43,000 and $60,000 respectively.<br />

The Sheltair Group Page 24<br />

Sept 2003