Budget Estimator<br />

<strong>Flinders</strong> <strong>University</strong> <strong>Land</strong> <strong>Management</strong> <strong>Plan</strong><br />

<strong>2004</strong>/2005 Task Pest <strong>Plan</strong>t control Revegetation Labour<br />

Miscellaneous Total<br />

Herbicide Equipment Subtotal Per tube No. Tubes Subtotal Hours $/hour Subtotal Per unit No. Units Subtotal<br />

Precinct 1 Remove Aleppo Pines from Parcel 1.1 $0 $10,000 $10,000 $0 0 $ - 200 $40 $8,000 $0 0 $ - $18,000<br />

Install signage adjacent Parcel 1.1 $0 $0 $0 $0 0 $0 0 $0 $0 $350 1 $350 $350<br />

Remove Olives from riparian zone, working downstream $60 $0 $60 $0 0 $0 32 $35 $1,120 $0 0 $0 $1,180<br />

Revegetate Parcel 1.1 $0 $0 $0 $3 1100 $3,300 60 $35 $2,100 $0 0 $0 $5,400<br />

Revegetate riparian zone (where Olives were removed) $0 $0 $0 $3 550 $1,650 32 $35 $1,120 $0 0 $0 $2,770<br />

Close informal access trails that are causing erosion –using<br />

permapine barriers to prevent access and/or revegetation along $0 $0 $0 $0 0 $0 0 $0 $0 $200 15 $3,000 $3,000<br />

trail<br />

Precinct 2 Remove proclaimed pest plant and environmental weed species,<br />

focusing on olives and wattles.<br />

$60 $0 $60 $0 0 $0 48 $35 $1,680 $0 0 $0 $1,740<br />

Remove Coolatai grass using slash and spray technique $20 $0 $20 $0 0 $0 16 $35 $560 $0 0 $0 $580<br />

Install signage adjacent Coolatai grass infestation that explains the<br />

environmental weed problem and removal process<br />

$0 $0 $0 $0 0 $0 0 $0 $0 $350 1 $350 $350<br />

Precinct 3 Remove isolated pest plants $10 $0 $10 $0 0 $0 16 $35 $560 $0 0 $0 $570<br />

Precinct 4 Ringbark Aleppo Pines in identified parcel $0 $0 $0 $0 0 $0 16 $35 $560 $0 0 $0 $560<br />

Precinct 5<br />

Remove pest plants, particularly Olives, in Parcel 5.1 (20 metre<br />

wide fuel reduction zone adjacent the residential boundary).<br />

$60 $0 $60 $0 0 $0 60 $35 $2,100 $0 0 $0 $2,160<br />

Remove infestations of Broom (cut and swab) and Coolatai grass<br />

(slash and spray) from identified parcels<br />

$30 $0 $30 $0 0 $0 40 $35 $1,400 $0 0 $0 $1,430<br />

Remove Monadenia from identified parcel $0 $0 $0 $0 0 $0 80 $35 $2,800 $0 0 $0 $2,800<br />

Ringbark or remove isolated Aleppo Pines (depending on<br />

accessibility)<br />

$0 $0 $0 $0 0 $0 24 $35 $840 $0 0 $0 $840<br />

Precinct 6 Remove pest plants, particularly Olives, in Parcel 6.1 (20 metre<br />

wide fuel reduction zone adjacent the residential boundary).<br />

$35 $0 $35 $0 0 $0 40 $35 $1,400 $0 0 $0 $1,435<br />

Remove pest plant and environmental weed species from Parcel<br />

6.2<br />

$50 $0 $50 $0 0 $0 80 $35 $2,800 $0 0 $0 $2,850<br />

Precinct 7 Remove infestation of Coolatai grass from identified parcels using<br />

slash and spray technique<br />

$20 $0 $20 $0 0 $0 32 $35 $1,120 $0 0 $0 $1,140<br />

Drill and fill large Olives, or remove where possible,<br />

in Parcel 7.1 (20 metre wide fuel reduction zone<br />

$60 $0 $60 $0 0 $0 80 $35 $2,800 $0 0 $0 $2,860<br />

adjacent the northern precinct boundary).<br />

Totals $405 $405 $4,950 $856 $565 $30,960 $3,700 $40,015<br />

Tube costs from Rawlinsons<br />

The planting of tubes does not include a tree guard, stake or mulching