05.01.2014 Views

TRANSPORTATiON ImPROvEmENT PROGRAm - Houston ...

TRANSPORTATiON ImPROvEmENT PROGRAm - Houston ...

TRANSPORTATiON ImPROvEmENT PROGRAm - Houston ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MPOID<br />

[CSJ]<br />

SPONSOR<br />

HOUSTON-GALVESTON MPO<br />

APPENDIX D<br />

2035 RTP UPDATE - PROJECTS UNDERGOING ENVIRONMENTAL ASSESSMENT<br />

FACILITY<br />

FROM<br />

TO<br />

Harris County Projects<br />

536<br />

[0389-13-039]<br />

CITY OF BAYTOWN<br />

SH 146<br />

AT BS 146E<br />

FERRY RD<br />

DESCRIPTION<br />

CONSTRUCT 4 MAINLANES AND GRADE SEPARATION<br />

FISCAL YEAR<br />

LENGTH<br />

TOTAL PROJECT COST<br />

2020<br />

0.87<br />

$47,090,744<br />

13635<br />

[0389-13-056]<br />

TXDOT HOUSTON<br />

DISTRICT<br />

SH 146<br />

AT SP 330<br />

CONSTRUCT DIRECT CONNECTOR (RAMP C DC EB TO<br />

NB)<br />

2021<br />

0.001<br />

$16,949,000<br />

11764<br />

METRO<br />

SH 288<br />

ALMEDA LINE GRT (RR ROW)<br />

INTERMODAL TERMINAL<br />

SH 288 ALMEDA LINE GUIDED RAPID TRANSIT<br />

2033<br />

$250,000,000<br />

14252<br />

[1685-05-098]<br />

TXDOT HOUSTON<br />

DISTRICT<br />

15590<br />

TXDOT HOUSTON<br />

DISTRICT<br />

SH 6<br />

S OF HEMPSTEAD TOLL ROAD<br />

US 290<br />

SH 99<br />

AT SH 249<br />

RECONSTRUCT US 290/SH 6 INTERCHANGE<br />

CONSTRUCT 4 DIRECT CONNECTORS (TOLL)<br />

2032<br />

0.72<br />

$77,593,000<br />

2030<br />

0.75<br />

$104,000,000<br />

15591<br />

TXDOT HOUSTON<br />

DISTRICT<br />

SH 99<br />

AT IH 45 N<br />

CONSTRUCT 4 DIRECT CONNECTORS (TOLL)<br />

2030<br />

0.75<br />

$104,000,000<br />

14264<br />

[3187-01-009]<br />

TXDOT HOUSTON<br />

DISTRICT<br />

315<br />

[3510-08-001]<br />

TXDOT HOUSTON<br />

DISTRICT<br />

2931<br />

CITY OF HOUSTON<br />

SH 99<br />

BS 146 W<br />

SH 146<br />

SH 99<br />

MONTGOMERY C/L<br />

LIBERTY C/L<br />

SIMS BAYOU TRAIL<br />

POST OAK RD S<br />

IH 45 S<br />

SEG I-2: CONSTRUCT 4-LANE TOLL WAY WITH<br />

INTERCHANGES AND TWO NON-CONTINUOUS 2-LANE<br />

FRONTAGE ROADS<br />

SEG H: CONSTRUCT 4-LANE TOLLWAY WITH<br />

INTERCHANGES AND TWO NON-CONTINUOUS 2-LANE<br />

FRONTAGE ROADS<br />

CONSTRUCT SIMS BAYOU TRAIL<br />

2020<br />

3.02<br />

$101,600,000<br />

2020<br />

1.9<br />

$40,700,000<br />

2020<br />

14<br />

$11,601,957<br />

13653<br />

CITY OF PINEY<br />

POINT VILLAGE<br />

SMITHDALE RD<br />

PINEY POINT RD N<br />

HEDWIG RD<br />

SMITHDALE - CONSTRUCT 6' WIDE SIDEWALKS ON<br />

BOTH SIDES OF THE STREET TO IMPROVE PEDESTRIAN<br />

MOBILITY IN CITY; MEMORIAL DRIVE ELEM. SCHOOL IN<br />

ON SMITHDALE. IN ORDER TO INSTALL SIDEWALKS<br />

THE CITY MUST REMOVE THE EXISTING ASPHALT ROAD<br />

AND CONSTRUCT A CONCRETE CURB AND GUTTER<br />

ROADWAY. CONSTRUCT AN UNDERGROUND STORM<br />

SEWER SYSTEM REMOVE THE ROADSIDE DITCHES.<br />

2020<br />

0.534<br />

$2,747,832<br />

Sorted by: Street, CSJ Number, then MPOID<br />

4/27/2012 Page 38 of 53

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!