Friday, April 27, 2012 HOUSTON-GALVESTON MPO<br />
3-27<br />
FY 2013-2016 TRANSPORTATION IMPROVEMENT PROGRAM<br />
AS ADOPTED - 4/27/2012<br />
HOUSTON DISTRICT<br />
FY 2013 (SEPT - AUG)<br />
Projects grouped by TxDOT District and Fiscal Year,<br />
sorted by County, Hwy, Street and CSJ/MPOID<br />
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST<br />
HOUSTON HARRIS CS C,E,R BAYTOWN CITY OF BAYTOWN $8,935,540<br />
REV DATE: 04/2012<br />
STREET:<br />
MPO PROJECT ID: 10795<br />
LIMITS FROM:<br />
FUNDING CATEGORY: 3<br />
LIMITS TO:<br />
MTP REFERENCE:<br />
TIP<br />
DESCRIPTION:<br />
REMARKS:<br />
BAKER RD<br />
N MAIN ST<br />
SJOLANDER RD<br />
CONSTRUCT 5-LANE REINFORCED CONCRETE PAVEMENT WITH CURB, GUTTER & STORM<br />
SEWERS W/ CLTL<br />
Project History:<br />
Total Project Cost Information:<br />
Preliminary Engineering: $291,933<br />
Right Of Way: $1,489,455<br />
Construction: $5,957,821<br />
Construction Engineering $297,891<br />
Contingencies: $595,782<br />
Indirects: $302,657<br />
Bond Financing: ---<br />
Total Project Cost: $8,935,540<br />
Cost of<br />
Approved<br />
Phases:<br />
$8,935,540<br />
Authorized Funding by Category/Share:<br />
Local<br />
Funding<br />
Federal State Regional Local Contribution By Category<br />
3-LOCAL: --- --- --- $8,935,540 --- $8,935,540<br />
Funding by Share: --- --- --- $8,935,540 --- $8,935,540<br />
HOUSTON HARRIS 0912-71-799 CS C,E HOUSTON CITY OF HOUSTON $3,945,563<br />
REV DATE: 04/2012<br />
STREET: BUFFALO BAYOU HERITAGE CORRIDOR<br />
MPO PROJECT ID: 10348<br />
LIMITS FROM:<br />
LIMITS TO:<br />
MCKEE ST<br />
W OF JENSEN DR<br />
FUNDING CATEGORY:<br />
MTP REFERENCE:<br />
3,9<br />
TIP<br />
DESCRIPTION:<br />
12' WIDE CONCRETE SHARED USE PATH: BUFFALO HERITAGE CORRIDOR SHARED USE<br />
TRAIL IN HOUSTON<br />
NOx (KG/DAY): 0.36 VOC (KG/DAY): 0.22<br />
REMARKS:<br />
Project History:<br />
Total Project Cost Information:<br />
Preliminary Engineering: $133,021<br />
Right Of Way: ---<br />
Construction: $2,714,707<br />
Construction Engineering $173,198<br />
Contingencies: $191,930<br />
Indirects: $189,215<br />
Bond Financing: ---<br />
Total Project Cost: $3,402,071<br />
Cost of<br />
Approved<br />
Phases:<br />
$2,847,727<br />
Authorized Funding by Category/Share:<br />
Local<br />
Funding<br />
Federal State Regional Local Contribution By Category<br />
3-LOCAL CONT: --- --- ---<br />
--- $184,302 $184,302<br />
9-STP-ENH: $3,009,009 --- --- $752,252 --- $3,761,261<br />
Funding by Share: $3,009,009 --- --- $752,252 $184,302 $3,945,563<br />
HOUSTON HARRIS CS C,E,R PASADENA CITY OF PASADENA $6,833,060<br />
REV DATE: 04/2012<br />
STREET: BURKE RD<br />
MPO PROJECT ID: 11029<br />
LIMITS FROM:<br />
LIMITS TO:<br />
SOUTHMORE<br />
PASADENA BLVD<br />
FUNDING CATEGORY:<br />
MTP REFERENCE:<br />
3<br />
TIP<br />
DESCRIPTION:<br />
RECONSTRUCT ROADWAY INCLUDING DRAINAGE, WATER, SEWER & SIDEWALKS<br />
REMARKS:<br />
Project History:<br />
Total Project Cost Information:<br />
Preliminary Engineering: $223,243<br />
Right Of Way: $1,138,995<br />
Construction: $4,555,981<br />
Construction Engineering $227,799<br />
Contingencies: $455,598<br />
Indirects: $231,444<br />
Bond Financing: ---<br />
Total Project Cost: $6,833,060<br />
Cost of<br />
Approved<br />
Phases:<br />
$6,833,060<br />
Authorized Funding by Category/Share:<br />
Local<br />
Funding<br />
Federal State Regional Local Contribution By Category<br />
3-LOCAL: --- --- --- $6,833,060 --- $6,833,060<br />
Funding by Share: --- --- --- $6,833,060 --- $6,833,060<br />
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER