Friday, April 27, 2012 HOUSTON-GALVESTON MPO<br />

3-27<br />

FY 2013-2016 TRANSPORTATION IMPROVEMENT PROGRAM<br />

AS ADOPTED - 4/27/2012<br />

HOUSTON DISTRICT<br />

FY 2013 (SEPT - AUG)<br />

Projects grouped by TxDOT District and Fiscal Year,<br />

sorted by County, Hwy, Street and CSJ/MPOID<br />

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST<br />

HOUSTON HARRIS CS C,E,R BAYTOWN CITY OF BAYTOWN $8,935,540<br />

REV DATE: 04/2012<br />

STREET:<br />

MPO PROJECT ID: 10795<br />

LIMITS FROM:<br />

FUNDING CATEGORY: 3<br />

LIMITS TO:<br />

MTP REFERENCE:<br />

TIP<br />

DESCRIPTION:<br />

REMARKS:<br />

BAKER RD<br />

N MAIN ST<br />

SJOLANDER RD<br />

CONSTRUCT 5-LANE REINFORCED CONCRETE PAVEMENT WITH CURB, GUTTER & STORM<br />

SEWERS W/ CLTL<br />

Project History:<br />

Total Project Cost Information:<br />

Preliminary Engineering: $291,933<br />

Right Of Way: $1,489,455<br />

Construction: $5,957,821<br />

Construction Engineering $297,891<br />

Contingencies: $595,782<br />

Indirects: $302,657<br />

Bond Financing: ---<br />

Total Project Cost: $8,935,540<br />

Cost of<br />

Approved<br />

Phases:<br />

$8,935,540<br />

Authorized Funding by Category/Share:<br />

Local<br />

Funding<br />

Federal State Regional Local Contribution By Category<br />

3-LOCAL: --- --- --- $8,935,540 --- $8,935,540<br />

Funding by Share: --- --- --- $8,935,540 --- $8,935,540<br />

HOUSTON HARRIS 0912-71-799 CS C,E HOUSTON CITY OF HOUSTON $3,945,563<br />

REV DATE: 04/2012<br />

STREET: BUFFALO BAYOU HERITAGE CORRIDOR<br />

MPO PROJECT ID: 10348<br />

LIMITS FROM:<br />

LIMITS TO:<br />

MCKEE ST<br />

W OF JENSEN DR<br />

FUNDING CATEGORY:<br />

MTP REFERENCE:<br />

3,9<br />

TIP<br />

DESCRIPTION:<br />

12' WIDE CONCRETE SHARED USE PATH: BUFFALO HERITAGE CORRIDOR SHARED USE<br />

TRAIL IN HOUSTON<br />

NOx (KG/DAY): 0.36 VOC (KG/DAY): 0.22<br />

REMARKS:<br />

Project History:<br />

Total Project Cost Information:<br />

Preliminary Engineering: $133,021<br />

Right Of Way: ---<br />

Construction: $2,714,707<br />

Construction Engineering $173,198<br />

Contingencies: $191,930<br />

Indirects: $189,215<br />

Bond Financing: ---<br />

Total Project Cost: $3,402,071<br />

Cost of<br />

Approved<br />

Phases:<br />

$2,847,727<br />

Authorized Funding by Category/Share:<br />

Local<br />

Funding<br />

Federal State Regional Local Contribution By Category<br />

3-LOCAL CONT: --- --- ---<br />

--- $184,302 $184,302<br />

9-STP-ENH: $3,009,009 --- --- $752,252 --- $3,761,261<br />

Funding by Share: $3,009,009 --- --- $752,252 $184,302 $3,945,563<br />

HOUSTON HARRIS CS C,E,R PASADENA CITY OF PASADENA $6,833,060<br />

REV DATE: 04/2012<br />

STREET: BURKE RD<br />

MPO PROJECT ID: 11029<br />

LIMITS FROM:<br />

LIMITS TO:<br />

SOUTHMORE<br />

PASADENA BLVD<br />

FUNDING CATEGORY:<br />

MTP REFERENCE:<br />

3<br />

TIP<br />

DESCRIPTION:<br />

RECONSTRUCT ROADWAY INCLUDING DRAINAGE, WATER, SEWER & SIDEWALKS<br />

REMARKS:<br />

Project History:<br />

Total Project Cost Information:<br />

Preliminary Engineering: $223,243<br />

Right Of Way: $1,138,995<br />

Construction: $4,555,981<br />

Construction Engineering $227,799<br />

Contingencies: $455,598<br />

Indirects: $231,444<br />

Bond Financing: ---<br />

Total Project Cost: $6,833,060<br />

Cost of<br />

Approved<br />

Phases:<br />

$6,833,060<br />

Authorized Funding by Category/Share:<br />

Local<br />

Funding<br />

Federal State Regional Local Contribution By Category<br />

3-LOCAL: --- --- --- $6,833,060 --- $6,833,060<br />

Funding by Share: --- --- --- $6,833,060 --- $6,833,060<br />

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER