Friday, April 27, 2012 HOUSTON-GALVESTON MPO<br />

3-34<br />

FY 2013-2016 TRANSPORTATION IMPROVEMENT PROGRAM<br />

AS ADOPTED - 4/27/2012<br />

HOUSTON DISTRICT<br />

FY 2013 (SEPT - AUG)<br />

Projects grouped by TxDOT District and Fiscal Year,<br />

sorted by County, Hwy, Street and CSJ/MPOID<br />

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST<br />

HOUSTON HARRIS CS C,E,R HOUSTON CITY OF HOUSTON $22,044,000<br />

REV DATE: 04/2012<br />

STREET:<br />

MPO PROJECT ID: 5040<br />

LIMITS FROM:<br />

FUNDING CATEGORY: 3<br />

LIMITS TO:<br />

MTP REFERENCE:<br />

TIP<br />

DESCRIPTION:<br />

REMARKS:<br />

PARKER RD<br />

HARDY TOLL RD<br />

US 59<br />

PROJECT PROVIDES FOR THE RIGHT-OF-WAY ACQUISITION, DESIGN AND CONSTRUCTION<br />

OF A 4-LANE DIVIDED CONCRETE ROADWAY WITH STORM DRAINAGE, CURBS,<br />

SIDEWALKS, DRIVEWAYS, STREET LIGHTING, TRAFFIC CONTROL AND UNDERGROUND<br />

UTILITIES.<br />

Project History:<br />

Total Project Cost Information:<br />

Preliminary Engineering: $720,200<br />

Right Of Way: $3,674,490<br />

Construction: $14,697,960<br />

Construction Engineering $734,898<br />

Contingencies: $1,469,796<br />

Indirects: $746,656<br />

Bond Financing: ---<br />

Total Project Cost: $22,044,000<br />

Cost of<br />

Approved<br />

Phases:<br />

$22,044,000<br />

Authorized Funding by Category/Share:<br />

Local<br />

Funding<br />

Federal State Regional Local Contribution By Category<br />

3-LOCAL: --- --- --- $22,044,000 --- $22,044,000<br />

Funding by Share: --- --- --- $22,044,000 --- $22,044,000<br />

HOUSTON HARRIS 0912-72-063 CS C PASADENA CITY OF PASADENA $1,366,347<br />

REV DATE: 04/2012<br />

STREET: PRESTON RD<br />

MPO PROJECT ID: 13521<br />

LIMITS FROM:<br />

LIMITS TO:<br />

BW 8<br />

GENOA RED BLUFF RD<br />

FUNDING CATEGORY:<br />

MTP REFERENCE:<br />

3,10<br />

TIP<br />

DESCRIPTION:<br />

CONSTRUCT 4-LANE DIVIDED THOROUGHFARE<br />

REMARKS:<br />

Project History:<br />

Total Project Cost Information:<br />

Preliminary Engineering: $49,720<br />

Right Of Way: ---<br />

Construction: $1,014,694<br />

Construction Engineering $60,882<br />

Contingencies: $71,029<br />

Indirects: $70,724<br />

Bond Financing: ---<br />

Total Project Cost: $1,267,048<br />

Cost of<br />

Approved<br />

Phases:<br />

$1,014,694<br />

Authorized Funding by Category/Share:<br />

Local<br />

Funding<br />

Federal State Regional Local Contribution By Category<br />

3-LOCAL CONT: --- --- ---<br />

--- $204,636 $204,636<br />

10-MISC: $929,369 --- --- $232,342 --- $1,161,711<br />

Funding by Share: $929,369 --- --- $232,342 $204,636 $1,366,347<br />

HOUSTON HARRIS 1258-04-056 FM 1093 C HOUSTON TXDOT HOUSTON DISTRICT $5,624,320<br />

REV DATE: 04/2012<br />

STREET: FM 1093<br />

MPO PROJECT ID: 11982<br />

LIMITS FROM:<br />

LIMITS TO:<br />

IH 610<br />

SH 6<br />

FUNDING CATEGORY:<br />

MTP REFERENCE:<br />

3,5<br />

TIP<br />

DESCRIPTION:<br />

IMPLEMENT ACCESS MANAGEMENT TREATMENTS (PHASE II)<br />

NOx (KG/DAY): 31.406 VOC (KG/DAY): 51.153<br />

REMARKS:<br />

Project History:<br />

Total Project Cost Information:<br />

Preliminary Engineering: $197,496<br />

Right Of Way: ---<br />

Construction: $4,030,529<br />

Construction Engineering $257,148<br />

Contingencies: $284,958<br />

Indirects: $280,928<br />

Bond Financing: ---<br />

Total Project Cost: $5,051,059<br />

Cost of<br />

Approved<br />

Phases:<br />

$4,030,529<br />

Authorized Funding by Category/Share:<br />

Local<br />

Funding<br />

Federal State Regional Local Contribution By Category<br />

3-LOCAL CONT: --- --- ---<br />

--- $1,748,811 $1,748,811<br />

5-CMAQ: $3,100,407 --- --- $775,102 --- $3,875,509<br />

Funding by Share: $3,100,407 --- --- $775,102 $1,748,811 $5,624,320<br />

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER