Friday, April 27, 2012 HOUSTON-GALVESTON MPO<br />
3-34<br />
FY 2013-2016 TRANSPORTATION IMPROVEMENT PROGRAM<br />
AS ADOPTED - 4/27/2012<br />
HOUSTON DISTRICT<br />
FY 2013 (SEPT - AUG)<br />
Projects grouped by TxDOT District and Fiscal Year,<br />
sorted by County, Hwy, Street and CSJ/MPOID<br />
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST<br />
HOUSTON HARRIS CS C,E,R HOUSTON CITY OF HOUSTON $22,044,000<br />
REV DATE: 04/2012<br />
STREET:<br />
MPO PROJECT ID: 5040<br />
LIMITS FROM:<br />
FUNDING CATEGORY: 3<br />
LIMITS TO:<br />
MTP REFERENCE:<br />
TIP<br />
DESCRIPTION:<br />
REMARKS:<br />
PARKER RD<br />
HARDY TOLL RD<br />
US 59<br />
PROJECT PROVIDES FOR THE RIGHT-OF-WAY ACQUISITION, DESIGN AND CONSTRUCTION<br />
OF A 4-LANE DIVIDED CONCRETE ROADWAY WITH STORM DRAINAGE, CURBS,<br />
SIDEWALKS, DRIVEWAYS, STREET LIGHTING, TRAFFIC CONTROL AND UNDERGROUND<br />
UTILITIES.<br />
Project History:<br />
Total Project Cost Information:<br />
Preliminary Engineering: $720,200<br />
Right Of Way: $3,674,490<br />
Construction: $14,697,960<br />
Construction Engineering $734,898<br />
Contingencies: $1,469,796<br />
Indirects: $746,656<br />
Bond Financing: ---<br />
Total Project Cost: $22,044,000<br />
Cost of<br />
Approved<br />
Phases:<br />
$22,044,000<br />
Authorized Funding by Category/Share:<br />
Local<br />
Funding<br />
Federal State Regional Local Contribution By Category<br />
3-LOCAL: --- --- --- $22,044,000 --- $22,044,000<br />
Funding by Share: --- --- --- $22,044,000 --- $22,044,000<br />
HOUSTON HARRIS 0912-72-063 CS C PASADENA CITY OF PASADENA $1,366,347<br />
REV DATE: 04/2012<br />
STREET: PRESTON RD<br />
MPO PROJECT ID: 13521<br />
LIMITS FROM:<br />
LIMITS TO:<br />
BW 8<br />
GENOA RED BLUFF RD<br />
FUNDING CATEGORY:<br />
MTP REFERENCE:<br />
3,10<br />
TIP<br />
DESCRIPTION:<br />
CONSTRUCT 4-LANE DIVIDED THOROUGHFARE<br />
REMARKS:<br />
Project History:<br />
Total Project Cost Information:<br />
Preliminary Engineering: $49,720<br />
Right Of Way: ---<br />
Construction: $1,014,694<br />
Construction Engineering $60,882<br />
Contingencies: $71,029<br />
Indirects: $70,724<br />
Bond Financing: ---<br />
Total Project Cost: $1,267,048<br />
Cost of<br />
Approved<br />
Phases:<br />
$1,014,694<br />
Authorized Funding by Category/Share:<br />
Local<br />
Funding<br />
Federal State Regional Local Contribution By Category<br />
3-LOCAL CONT: --- --- ---<br />
--- $204,636 $204,636<br />
10-MISC: $929,369 --- --- $232,342 --- $1,161,711<br />
Funding by Share: $929,369 --- --- $232,342 $204,636 $1,366,347<br />
HOUSTON HARRIS 1258-04-056 FM 1093 C HOUSTON TXDOT HOUSTON DISTRICT $5,624,320<br />
REV DATE: 04/2012<br />
STREET: FM 1093<br />
MPO PROJECT ID: 11982<br />
LIMITS FROM:<br />
LIMITS TO:<br />
IH 610<br />
SH 6<br />
FUNDING CATEGORY:<br />
MTP REFERENCE:<br />
3,5<br />
TIP<br />
DESCRIPTION:<br />
IMPLEMENT ACCESS MANAGEMENT TREATMENTS (PHASE II)<br />
NOx (KG/DAY): 31.406 VOC (KG/DAY): 51.153<br />
REMARKS:<br />
Project History:<br />
Total Project Cost Information:<br />
Preliminary Engineering: $197,496<br />
Right Of Way: ---<br />
Construction: $4,030,529<br />
Construction Engineering $257,148<br />
Contingencies: $284,958<br />
Indirects: $280,928<br />
Bond Financing: ---<br />
Total Project Cost: $5,051,059<br />
Cost of<br />
Approved<br />
Phases:<br />
$4,030,529<br />
Authorized Funding by Category/Share:<br />
Local<br />
Funding<br />
Federal State Regional Local Contribution By Category<br />
3-LOCAL CONT: --- --- ---<br />
--- $1,748,811 $1,748,811<br />
5-CMAQ: $3,100,407 --- --- $775,102 --- $3,875,509<br />
Funding by Share: $3,100,407 --- --- $775,102 $1,748,811 $5,624,320<br />
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER