Friday, April 27, 2012 HOUSTON-GALVESTON MPO<br />
3-52<br />
FY 2013-2016 TRANSPORTATION IMPROVEMENT PROGRAM<br />
AS ADOPTED - 4/27/2012<br />
HOUSTON DISTRICT<br />
FY 2014 (SEPT - AUG)<br />
Projects grouped by TxDOT District and Fiscal Year,<br />
sorted by County, Hwy, Street and CSJ/MPOID<br />
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST<br />
HOUSTON HARRIS CS C,E,R HOUSTON CITY OF HOUSTON $5,106,000<br />
REV DATE: 04/2012<br />
STREET:<br />
MPO PROJECT ID: 10052<br />
LIMITS FROM:<br />
FUNDING CATEGORY: 3<br />
LIMITS TO:<br />
MTP REFERENCE:<br />
TIP<br />
DESCRIPTION:<br />
REMARKS:<br />
ALABAMA ST W<br />
WESLAYAN ST<br />
SHEPHERD DR S<br />
ENGR & ROW ACQ OF EXISTING RDWY W/ CONCRETE PAVING, CURBS, SIDEWALKS,<br />
STREET LIGHTING & UNDERGROUND UTILITIES AS NEEDED<br />
Project History:<br />
Total Project Cost Information:<br />
Preliminary Engineering: $166,818<br />
Right Of Way: $851,113<br />
Construction: $3,404,454<br />
Construction Engineering $170,223<br />
Contingencies: $340,445<br />
Indirects: $172,946<br />
Bond Financing: ---<br />
Total Project Cost: $5,106,000<br />
Cost of<br />
Approved<br />
Phases:<br />
$5,106,000<br />
Authorized Funding by Category/Share:<br />
Local<br />
Funding<br />
Federal State Regional Local Contribution By Category<br />
3-LOCAL: --- --- --- $5,106,000 --- $5,106,000<br />
Funding by Share: --- --- --- $5,106,000 --- $5,106,000<br />
HOUSTON HARRIS CS C,E,R UPTOWN HOUSTON DISTRICT $8,100,000<br />
REV DATE: 04/2012<br />
STREET: ALABAMA W<br />
MPO PROJECT ID: 11007<br />
LIMITS FROM:<br />
LIMITS TO:<br />
SAGE ST<br />
IH 610<br />
FUNDING CATEGORY:<br />
MTP REFERENCE:<br />
3<br />
TIP<br />
DESCRIPTION:<br />
RECONFIGURE AND RECONSTRUCT ROADWAY INCLUDING PAVEMENT, SIGNALIZATION<br />
AND SIDEWALK IMPROVEMENTS<br />
NOx (KG/DAY): 3.669 VOC (KG/DAY): 1.775<br />
REMARKS:<br />
Project History:<br />
Total Project Cost Information:<br />
Preliminary Engineering: $264,635<br />
Right Of Way: $1,350,180<br />
Construction: $5,400,720<br />
Construction Engineering $270,036<br />
Contingencies: $540,072<br />
Indirects: $274,357<br />
Bond Financing: ---<br />
Total Project Cost: $8,100,000<br />
Cost of<br />
Approved<br />
Phases:<br />
$8,100,000<br />
Authorized Funding by Category/Share:<br />
Local<br />
Funding<br />
Federal State Regional Local Contribution By Category<br />
3-LOCAL: --- --- --- $8,100,000 --- $8,100,000<br />
Funding by Share: --- --- --- $8,100,000 --- $8,100,000<br />
HOUSTON HARRIS CS C,E,R HOUSTON CITY OF HOUSTON $9,999,000<br />
REV DATE: 04/2012<br />
STREET: BRITTMOORE RD<br />
MPO PROJECT ID: 57<br />
LIMITS FROM:<br />
LIMITS TO:<br />
HAMMERLY BLVD<br />
CLAY RD<br />
FUNDING CATEGORY:<br />
MTP REFERENCE:<br />
3<br />
TIP<br />
DESCRIPTION:<br />
WIDEN TO 4-LANE DIVIDED<br />
REMARKS:<br />
Project History:<br />
Total Project Cost Information:<br />
Preliminary Engineering: $326,678<br />
Right Of Way: $1,666,722<br />
Construction: $6,666,889<br />
Construction Engineering $333,344<br />
Contingencies: $666,689<br />
Indirects: $338,678<br />
Bond Financing: ---<br />
Total Project Cost: $9,999,000<br />
Cost of<br />
Approved<br />
Phases:<br />
$9,999,000<br />
Authorized Funding by Category/Share:<br />
Local<br />
Funding<br />
Federal State Regional Local Contribution By Category<br />
3-LOCAL: --- --- --- $9,999,000 --- $9,999,000<br />
Funding by Share: --- --- --- $9,999,000 --- $9,999,000<br />
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER