05.01.2014 Views

TRANSPORTATiON ImPROvEmENT PROGRAm - Houston ...

TRANSPORTATiON ImPROvEmENT PROGRAm - Houston ...

TRANSPORTATiON ImPROvEmENT PROGRAm - Houston ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SUBJECT TO CHANGE<br />

FOR INFORMATION ONLY<br />

HOUSTON-GALVESTON AREA COUNCIL<br />

FY 2013-3016 TRANSPORTATION IMPROVEMENT PROGRAM<br />

AS ADOPTED - 4/27/2012<br />

APPENDIX J - STATEWIDE PROGRAMS (GROUPED CSJ PROJECTS)*<br />

SUBJECT TO CHANGE<br />

FOR INFORMATION ONLY<br />

HOUSTON DISTRICT - HARRIS COUNTY Current as of: January 9, 2012<br />

HWY<br />

CSJ FROM<br />

SPONSOR TO<br />

0389-05-115 SH 146<br />

AT KEMAH BRIDGE<br />

.<br />

0389-05-118<br />

TXDOT<br />

0389-12-087<br />

TXDOT<br />

0389-13-054<br />

TXDOT<br />

SH 146<br />

GALVESTON COUNTY LINE<br />

SOUTH STREET<br />

SH 146<br />

SOUTH STREET<br />

SPUR 55<br />

SH 146<br />

DOUGLAS DRIVE<br />

SH 146E<br />

0502-01-206 SH 225<br />

WAFER STREET<br />

BW 8<br />

0502-01-207<br />

TXDOT<br />

0598-01-076<br />

TXDOT<br />

0598-01-077<br />

TXDOT<br />

0051-02-070<br />

TXDOT<br />

SH 225<br />

SCARBOROUGH<br />

BEARLE STREET<br />

SH 288<br />

SH 288 SB FR AT BRAYS BAYOU<br />

.<br />

SH 288<br />

SH 288 NB FR AT BRAYS BAYOU<br />

.<br />

SH 3<br />

COLLEGE<br />

EDGEBROOK<br />

CURRENT FUNDING ($M)<br />

DESCRIPTION<br />

FY 2013 FY 2014 FY 2015 FY 2016<br />

REPAIR FENDER SYSTEM FED: 0.582<br />

STATE: 0.146<br />

LOCAL:<br />

TOTAL: 0.728<br />

BASE REPAIR AND ASPHALT CONCRETE<br />

PAVEMENT OVERLAY<br />

BASE REPAIR AND ASPHALT CONCRETE<br />

PAVEMENT OVERLAY<br />

BASE REPAIR AND ASPHALT CONCRETE<br />

PAVEMENT OVERLAY<br />

FED:<br />

STATE:<br />

LOCAL:<br />

0.848<br />

0.212<br />

TOTAL: 1.060<br />

FED:<br />

STATE:<br />

LOCAL:<br />

0.519<br />

0.130<br />

TOTAL: 0.649<br />

FED:<br />

STATE:<br />

LOCAL:<br />

0.260<br />

0.065<br />

TOTAL: 0.324<br />

HIGH MAST ILLUMINATION FED:<br />

STATE:<br />

LOCAL:<br />

TOTAL:<br />

1.595<br />

0.399<br />

1.994<br />

BASE REPAIR AND ASPHALT CONCRETE<br />

PAVEMENT OVERLAY<br />

REHABILITATE BRIDGE AND APPROACHES<br />

REHABILITATE BRIDGE AND APPROACHES<br />

INSTALL REINFORCED CONCRETE PIPE IN DITCH<br />

(PHASE 1)<br />

FED:<br />

STATE:<br />

LOCAL:<br />

1.731<br />

0.433<br />

TOTAL: 2.163<br />

FED:<br />

STATE:<br />

LOCAL:<br />

4.421<br />

1.105<br />

TOTAL: 5.526<br />

FED:<br />

STATE:<br />

LOCAL:<br />

3.650<br />

0.912<br />

TOTAL: 4.562<br />

FED:<br />

STATE:<br />

LOCAL:<br />

1.615<br />

0.404<br />

TOTAL: 2.019<br />

CAT/TOTALS<br />

1-PREV-M<br />

1-PREV-M<br />

1-PREV-M<br />

1-PREV-M<br />

1-PREV-M<br />

1-PREV-M<br />

6-BRIDGE<br />

6-BRIDGE<br />

11-ST DIST DISC<br />

* Grouped CSJ projects have been determined to be "Not Regionally Significant" and are not listed individually in the H-GAC<br />

Transportation Improvement Program or subject to its amendment process or regional emissions analysis (conformity).<br />

Page J-21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!