Friday, April 27, 2012 HOUSTON-GALVESTON MPO<br />
3-59<br />
FY 2013-2016 TRANSPORTATION IMPROVEMENT PROGRAM<br />
AS ADOPTED - 4/27/2012<br />
HOUSTON DISTRICT<br />
FY 2014 (SEPT - AUG)<br />
Projects grouped by TxDOT District and Fiscal Year,<br />
sorted by County, Hwy, Street and CSJ/MPOID<br />
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST<br />
HOUSTON HARRIS 0912-71-044 VA T HOUSTON METRO $10,394,415<br />
REV DATE: 04/2012<br />
STREET: INTERMODAL TERMINAL<br />
MPO PROJECT ID: 13517<br />
LIMITS FROM:<br />
LIMITS TO:<br />
BURNETT ST AT MAIN ST<br />
FUNDING CATEGORY:<br />
MTP REFERENCE:<br />
7<br />
TIP<br />
DESCRIPTION:<br />
CONSTRUCT INTERMODAL TRANSIT TERMINAL (ROADWAY ACCESS, ETC)<br />
REMARKS:<br />
Project History:<br />
Total Project Cost Information:<br />
Preliminary Engineering: ---<br />
Right Of Way: ---<br />
Construction: $10,394,415<br />
Construction Engineering ---<br />
Contingencies: ---<br />
Indirects: ---<br />
Bond Financing: ---<br />
Total Project Cost: $10,394,415<br />
Cost of<br />
Approved<br />
Phases:<br />
$10,394,415<br />
Authorized Funding by Category/Share:<br />
Local<br />
Funding<br />
Federal State Regional Local Contribution By Category<br />
7-STP-MM: $8,315,532 --- --- $2,078,883 --- $10,394,415<br />
Funding by Share: $8,315,532 --- --- $2,078,883 --- $10,394,415<br />
HOUSTON HARRIS 0912-72-133 VA C,E HOUSTON SOUTHWEST HOUSTON REDEVELOPMEN $54,119<br />
REV DATE: 04/2012<br />
STREET: MARINETTE DR<br />
MPO PROJECT ID: 11974<br />
LIMITS FROM:<br />
LIMITS TO:<br />
CLAREWOOD DR<br />
BELLAIRE BLVD<br />
FUNDING CATEGORY:<br />
MTP REFERENCE:<br />
3,5<br />
TIP<br />
DESCRIPTION:<br />
MARINETTE ON-STREET BIKE PATH<br />
NOx (KG/DAY): 0.395 VOC (KG/DAY): 0.252<br />
REMARKS:<br />
Project History:<br />
Total Project Cost Information:<br />
Preliminary Engineering: $2,528<br />
Right Of Way: ---<br />
Construction: $51,591<br />
Construction Engineering $4,643<br />
Contingencies: $5,159<br />
Indirects: $2,621<br />
Bond Financing: ---<br />
Total Project Cost: $66,542<br />
Cost of<br />
Approved<br />
Phases:<br />
$54,119<br />
Authorized Funding by Category/Share:<br />
Local<br />
Funding<br />
Federal State Regional Local Contribution By Category<br />
3-LOCAL CONT: --- --- ---<br />
--- $2,528<br />
$2,528<br />
5-CMAQ: $41,273 --- --- $10,318 ---<br />
$51,591<br />
Funding by Share: $41,273 --- --- $10,318 $2,528 $54,119<br />
HOUSTON MONTGOMERY CS C,E,R CONROE CITY OF CONROE $1,000,000<br />
REV DATE: 04/2012<br />
STREET: WILSON RD E<br />
MPO PROJECT ID: 15486<br />
LIMITS FROM:<br />
LIMITS TO:<br />
IH 45<br />
N. FRAZIER RD<br />
FUNDING CATEGORY:<br />
MTP REFERENCE:<br />
3<br />
TIP<br />
DESCRIPTION:<br />
WIDEN TO 3-LANES<br />
REMARKS:<br />
Project History:<br />
Total Project Cost Information:<br />
Preliminary Engineering: $32,455<br />
Right Of Way: $165,585<br />
Construction: $662,339<br />
Construction Engineering $39,740<br />
Contingencies: $66,234<br />
Indirects: $33,647<br />
Bond Financing: ---<br />
Total Project Cost: $1,000,000<br />
Cost of<br />
Approved<br />
Phases:<br />
$1,000,000<br />
Authorized Funding by Category/Share:<br />
Local<br />
Funding<br />
Federal State Regional Local Contribution By Category<br />
3-LOCAL: --- --- --- $1,000,000 --- $1,000,000<br />
Funding by Share: --- --- --- $1,000,000 --- $1,000,000<br />
PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER