EIS-0113_Section_9 - Hanford Site
EIS-0113_Section_9 - Hanford Site
EIS-0113_Section_9 - Hanford Site
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
de<br />
a77<br />
3 'j 3 {fl 1. 0<br />
M 005<br />
DO<br />
RECEIVED DOE-RL<br />
RECEIVED DOE-RL<br />
- Mr. Rich Halten/08 8 'Mr. Rim Ha11'sul IS 7<br />
r ^ p . LM<br />
M e'' 2 4<br />
2 _<br />
VJMDIVISION<br />
VIM DIVISION<br />
S. "a system diescribM is ectuaDy a 2-phase system, so lid, li md, aM vapor. Witt any<br />
of the em tami migrate through the vapor phase? Cesium In undWely bat what<br />
about Carbon an mnts<br />
We home these comments will be helpful to you in the ptepention of t he final stateme nt.<br />
3.5.2.47 d Strontium?<br />
Sircerolyd<br />
6. Tire a ant of he w t of Carbon Cazt b ed. to roe vapor Its<br />
movement to pater water table should .red. .t In be oth er warted assuming g<br />
ona<br />
. ṣu<br />
. orgy<br />
the acm of eontamm rnts in the liquid pas ph.. through Me umaturet ed may hot<br />
GGG<br />
be convervative.<br />
^<br />
7. Lava Howe and'voleen.m might be benfi ecial N net they may most. additiwut<br />
Bruce Blanchard, ard, Director<br />
ovr er ove the wa stes{ however, the po ssibility t ha t such even ts might nice ties e<br />
Rnvirtm<br />
entel P roject Review<br />
net<br />
water adds, bra.. of compa, tim'of the underlying mil , such et it comes in<br />
3.5.6.37 contact '" win the buried wastes sh ould be considered.<br />
3.5.3.16<br />
-/<br />
3.5.6. /<br />
8. Tae statem en t dhcu seas hydrau lic interconnec tion of Ne uppermost confined<br />
aquifer. not the unconfined aquifer ...in of the -200 Areas." Contou rs and<br />
_. mream6ncs of fi gure @.2 that endeavor a portion of the ground-water mnderftm<br />
WsAM the 1200 Areas* moves northwafd through the gap betwe en Gable Bu tte and<br />
Cable Mounteln The mmeet analysis s ho uld M dres the assible significa nc e of<br />
efforts on the uimarmo st emfined aquifer. V failu re of mtutel or engineered<br />
ben,/as should ocamr. The smlysis should i nclude effecta an g round-water<br />
movement'r^W tim, from riess in the water table accompanying postulat ed futu re<br />
inereas so in recberge during wetter periods ie.g., greater Loan 5.0 em/Year).<br />
9. The grouts+water model assume a t enfold increase in rabarge whereas Me<br />
aurfine-water m od el assumes a twofold Aeresss to annual p recipitation. The<br />
Impact(.) of molte (lean Doodi m, so . result of the P robable Maxima. Preolpl bstion<br />
f ollowing s aeries of wet yon should be evalu ated in Sm<br />
tlon 4.4.1. T7ds seal nds<br />
should consider cohmMmtimr impacts resulting f ro m flooding of-onvle ephemeral<br />
strem es and weeta pods.<br />
10. The US. Chops of Engtncem has evaluated the p ropnod constr uc tion of Ben<br />
Peanhtin Dam at river m il e 348,. ab ou t 18 km upsteam f ro m Richland, Washington.<br />
The higher water elevati on net would be c re ated by the dam could affat nuclear<br />
q fectiee W ed.,the bean of the Columbia River is the -190 Areas^ site The native<br />
would ho managed u Me, the. procedure+ selated for Trmearsnic and Tank West. -<br />
- tl.pr s A rebi h the of the Ban P it.f o P.. a[ by N o Corps could change the<br />
basisotn order n,the the Arm sr bite for rae waters would be evaluated,<br />
3Miuding the potential fm for nigher ground and acesh surface waters flat<br />
could resWt Prom<br />
ctit ofBen ou<br />
Franklin hepa Dam. This isbe s ld be addressed o in fire final<br />
statement ntem valuee of the in and y the 900<br />
site to L the Columbia River<br />
wild of ces.<br />
and<br />
a the high aa value is i. [.h end life nsoureac Stranded B[eloea0 trout W ran add<br />
aaBh t aan. N this Waco of the river. This mac h 1: e15o used by murgan eiq<br />
hold eagle.<br />
3.2.4.6"- We ha net<br />
at nine million cubic meter, of fill material would be hauled to Me "2110<br />
We st Area^ site and us ed fa backfrll and barrier cons truction. The borrow arer<br />
aMuld he reha .hated after the material is removed. Replacement of top mil ed<br />
revegetetron c ou ld be employed to nom Nis art to viable ha bitat.<br />
3 . 5.6 . 12 ^N Rector" Is 1. the "100 Awes" site and .p roduce, radioactive wastes net