12.01.2014 Views

Petr SICHO - Helsinki Institute of Physics

Petr SICHO - Helsinki Institute of Physics

Petr SICHO - Helsinki Institute of Physics

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Summary<br />

• Large number <strong>of</strong> R&D’s in different areas is ongoing<br />

• Development <strong>of</strong> radiation hard silicon sensors for fluence close to 2 ·10 16 n eq /cm 2 seems<br />

to be really serious issue…<br />

• To be ready for 2016 LHC shutdown is quite aggressive but still feasible<br />

• The overall production cost will be certainly a key factor…<br />

• We may even consider 2 different module types - cheaper ones for outer layers and<br />

more delicate (higher granularity, radiation harder) for pixel inner layers<br />

• New FE-I4 will be probably good solution for B-Layer replacement (Y2012?) and for<br />

outer Pixel layers at SLHC, however for innermost layer(s) at least the pixel size has to<br />

be further reduced<br />

• Upgrade <strong>of</strong> innermost B-layer seems to be in intermediate step to SLHC detector<br />

upgrade. Considering Y2012 very little time for substantial R&D is left!<br />

• Large fraction <strong>of</strong> the Atlas Pixel community is busy with commissioning and operation <strong>of</strong><br />

the Pixel detector at Cern<br />

1/07/2007 IWORID2008, Helsinky 16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!