Atlantic City Expressway Pleasantville Toll Plaza Express E-Z Pass ...
Atlantic City Expressway Pleasantville Toll Plaza Express E-Z Pass ...
Atlantic City Expressway Pleasantville Toll Plaza Express E-Z Pass ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Facilities Management Workshop<br />
May 14-18, 2005 Toronto, Ontario<br />
<strong>Pleasantville</strong> <strong>Toll</strong> <strong>Plaza</strong> – Elevated Walkway<br />
Original Design Concepts<br />
New <strong>Toll</strong> <strong>Plaza</strong> Improvements include:<br />
Pre-Engineered Steel Truss Bridge – single span, 240 Ft. L x 14Ft W,<br />
spanning entire toll plaza<br />
2 Structural Towers & Walkway - fully enclosed, complete HVAC systems, fire<br />
protection & plumbing, new electrical / communication systems, & elevators / stairs<br />
for each tower<br />
Walkway Exterior – combination of insulated aluminum panels & insulated glass<br />
panels / curved standing seam metal roof<br />
Tower Exterior – finished concrete panels, glass panel system, and corrugated<br />
metal panels<br />
4 Mechanical Lifts – 2 each direction; located at 4 ACM booths to raise coin<br />
vaults from booth to walkway<br />
New Electric / Power Service & Distribution System - design for entire plaza<br />
New Standby Generator & Associated Work<br />
Decorative Neon / Accent Lighting – located on bridge / tower structures.<br />
New <strong>Toll</strong> Lane, Concrete Island & Booth – located in eastbound direction