18.01.2014 Views

Atlantic City Expressway Pleasantville Toll Plaza Express E-Z Pass ...

Atlantic City Expressway Pleasantville Toll Plaza Express E-Z Pass ...

Atlantic City Expressway Pleasantville Toll Plaza Express E-Z Pass ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Facilities Management Workshop<br />

May 14-18, 2005 Toronto, Ontario<br />

<strong>Pleasantville</strong> <strong>Toll</strong> <strong>Plaza</strong> – Elevated Walkway<br />

Original Design Concepts<br />

New <strong>Toll</strong> <strong>Plaza</strong> Improvements include:<br />

Pre-Engineered Steel Truss Bridge – single span, 240 Ft. L x 14Ft W,<br />

spanning entire toll plaza<br />

2 Structural Towers & Walkway - fully enclosed, complete HVAC systems, fire<br />

protection & plumbing, new electrical / communication systems, & elevators / stairs<br />

for each tower<br />

Walkway Exterior – combination of insulated aluminum panels & insulated glass<br />

panels / curved standing seam metal roof<br />

Tower Exterior – finished concrete panels, glass panel system, and corrugated<br />

metal panels<br />

4 Mechanical Lifts – 2 each direction; located at 4 ACM booths to raise coin<br />

vaults from booth to walkway<br />

New Electric / Power Service & Distribution System - design for entire plaza<br />

New Standby Generator & Associated Work<br />

Decorative Neon / Accent Lighting – located on bridge / tower structures.<br />

New <strong>Toll</strong> Lane, Concrete Island & Booth – located in eastbound direction

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!