Mangochi-ICEIDA-Partnership-in-Public-Health-2012-2016-Part-II ...
Mangochi-ICEIDA-Partnership-in-Public-Health-2012-2016-Part-II ...
Mangochi-ICEIDA-Partnership-in-Public-Health-2012-2016-Part-II ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
MANGOCHI <strong>ICEIDA</strong> PARTNERSHIP IN PUBLIC HEALTH – PROGRAMME DOCUMENT <strong>2012</strong>-<strong>2016</strong><br />
Annex 1: Logical Framework Matrix and Work Plan<br />
Narrative Summary<br />
Overall Objective (Goal) MBSP<br />
To assist the Government of Malawi and<br />
the <strong>Mangochi</strong> District Council to improve<br />
liv<strong>in</strong>g standards <strong>in</strong> the rural communities<br />
<strong>in</strong> <strong>Mangochi</strong> District.<br />
Immediate Objective (Outcome)<br />
Increased availability, access and<br />
utilisation of high impact, quality<br />
maternal and child health services <strong>in</strong><br />
<strong>Mangochi</strong> District.<br />
Expected Results (Outputs)<br />
1. Improved health services<br />
<strong>in</strong>frastructure<br />
1.1.General <strong>in</strong>frastructure <strong>in</strong> the<br />
network of the MoH health centres is<br />
strengthened<br />
1.1.1. Safe water supply <strong>in</strong>stalled <strong>in</strong> at<br />
least 13 HCs (Annex 6. P.2 for proposed<br />
sites)<br />
1.1.2. Sanitation (latr<strong>in</strong>es) <strong>in</strong>stalled <strong>in</strong> at<br />
least 13 HCs (Annex 6. P.3 for proposed<br />
sites<br />
1.1.3. Electricity and power supply<br />
<strong>in</strong>stalled <strong>in</strong> at least 19 HCs (Annex 6. P.5<br />
for proposed sites)<br />
1.1.4. At least 10 placenta pits and 10<br />
<strong>in</strong>c<strong>in</strong>erators constructed <strong>in</strong> HCs (Annex 6.<br />
P.4 for proposed sites)<br />
1.1.5 General ma<strong>in</strong>tenance done <strong>in</strong> at<br />
least 13 health facilities<br />
1.1.6 General ma<strong>in</strong>tenance of build<strong>in</strong>gs<br />
and equipment through ma<strong>in</strong>tenance<br />
fund.<br />
1.2 Improved Infrastructure and<br />
equipment <strong>in</strong> maternal and neonatal<br />
care services <strong>in</strong> HCs<br />
1.2.1. At least 4 maternity wards<br />
constructed (Annex 7 for proposed sites)<br />
Objectively Verifiable<br />
Indicators<br />
Maternal mortality<br />
ratio (national)<br />
Infant mortality rate<br />
Under five mortality<br />
rate<br />
Pregnant women<br />
(%) start<strong>in</strong>g ANC <strong>in</strong><br />
first trimester of<br />
pregnancy<br />
Proportion of births<br />
attended by skilled<br />
health personnel<br />
(MDG <strong>in</strong>dicator 5.2)<br />
Percentage of under<br />
1 children fully<br />
immunized<br />
Pregnant women<br />
tested for HIV<br />
Number of HCs with<br />
own water supply<br />
Number of HCs with<br />
improved sanitation<br />
Number of HCs with<br />
electricity<br />
Number of HCs with<br />
adequate waste<br />
mgmt. standards<br />
Number of HCs<br />
ma<strong>in</strong>ta<strong>in</strong>ed<br />
Number of build<strong>in</strong>gs<br />
and equipment<br />
ma<strong>in</strong>ta<strong>in</strong>ed<br />
Number of<br />
maternity wards<br />
constructed<br />
Sources and<br />
MOV<br />
NSO<br />
HMIS<br />
HMIS<br />
HMIS<br />
HMIS<br />
HMIS<br />
HMIS<br />
HMIS/Survey<br />
HMIS/Survey<br />
HMIS/Survey<br />
HMIS/Survey<br />
HMIS/Survey<br />
Ma<strong>in</strong>tenance<br />
report<br />
HMIS/HSSP<br />
Assumptions<br />
Sufficient fund<strong>in</strong>g<br />
Women will<strong>in</strong>g and<br />
able to use the<br />
services.<br />
Sufficient supply of<br />
drugs and materials.<br />
Fuel (ambulances and<br />
vehicles)<br />
Interventions<br />
accepted by the<br />
community and<br />
leaders.<br />
(Output to Outcome)<br />
Adequate absorption<br />
capacity at DHO and<br />
DC.<br />
Good collaboration<br />
with all stakeholders.<br />
Timely evaluation of<br />
tenders<br />
Contractors available<br />
and reliable.<br />
Construction<br />
materials and fuel<br />
available.<br />
Susta<strong>in</strong>ed availability<br />
of fund<strong>in</strong>g<br />
42