CHAPTER 4 : OPERATING DIAGRAM<br />

4.1. We recommend to use the classic three valve combination:<br />

PTM<br />

TMP<br />

o<br />

PPM<br />

RP<br />

1) Start TMP :<br />

- RP on.<br />

- Open water line.<br />

- Open dry nitrogen line.<br />

- Open E2.<br />

- Open E3 (E 1 closed).<br />

- At pressure P < 1 mbar :<br />

. E2 closed .<br />

. Open El.<br />

- TMP on.<br />

2) Venting chamber to atmosphere:<br />

. - E3 closed.<br />

- Inert gas enters chamber (2 mn).<br />

_ Allow the pump running as much as possible to take the advantage of the dynamic seal potection when<br />

the purge is off.<br />

062794 • 10/1993