25.01.2014 Views

ODS / Release Guide / 3.1

ODS / Release Guide / 3.1

ODS / Release Guide / 3.1

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 4 Problem Resolutions<br />

Student<br />

The effected students have Banner SGBSTDN rows with effective term codes<br />

(effectivity date), where multiple curriculums can exist for a term, but do not have<br />

rows in SORLCUR for all subsequent effective terms (effectivity date) of SGBSTDN.<br />

Example:<br />

SGBSTDN may have rows with effective term codes 200610, 200620, 200630. A<br />

first curriculum exists in SORLCUR for 200610. Then a second curriculum was<br />

added for the second term of 200620. The first curriculum only displays in<br />

ACADEMIC_STUDY for the first term. It should display for the second and<br />

third term. For those cases where students are not getting the appropriate<br />

records loaded into ACADEMIC_STUDY and ENROLLMENT, EDW daily<br />

extracts and Cognos reports are under-reporting the number of students who<br />

are actually registered for classes.<br />

Resolution<br />

ACADEMIC_PERIOD_END was added to composite view<br />

AS_LEARNER_CURRICULUM_FOS and table MST_CURR_STUDENT. The join<br />

of SGBSTDN to SORLCUR was made to be on PIDM only in<br />

AS_LEARNER_CURRICULUM_FOS in order to get all current curricula data for<br />

each effective term. The joins between MST_STUDENT_TERM_STAGE and<br />

MST_CURR_STUDENT were fixed in the mappings<br />

LOAD_MST_CURRICULUM_BATCH, UPDATE_MST_GENERAL_STUDENT,<br />

and UPDATE_MST_GENERAL_STUDENT_TRM.<br />

1-19FMIO<br />

Impact<br />

The column mapped to the CENSUS_ENROLLMENT_DATE2 field in the<br />

MSVGVC1 view is incorrect. As a result, the SSBSECT_CENSUS_ENRL_DATE is<br />

being populated into this column instead of SSBSECT_CENSUS_2_DATE.<br />

Resolution<br />

CENSUS_ENROLLMENT_DATE1 was replaced with<br />

CENSUS_ENROLLMENT_DATE2 for field<br />

MSVGVC1.CENSUS_ENROLLMENT_DATE2.<br />

1-7AJ6X<br />

Impact<br />

The field COMPLETED_IND was null. This was populated with a Y when the<br />

checklist received date is not null otherwise set to N.<br />

Resolution<br />

The field COMPLETED_IND was null. It is now populated with the following:<br />

DECODE (SARCHKL_RECEIVE_DATE, NULL,'N','Y')<br />

1-7EQHZ<br />

Impact<br />

The field, SEC_TRANSCRIPT_RECEIVED_DATE was being populated by NULL.<br />

This was changed to populate from the High School Receive Date.<br />

Operational Data Store <strong>Release</strong> <strong>3.1</strong> April 2007<br />

40 <strong>Release</strong> <strong>Guide</strong> Confidential

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!