<strong>DICE</strong> <strong>Final</strong> <strong>Report</strong><br />

Other technical objectives, ‘D+ Setup & Configuration’ (B), ‘Target Review <strong>and</strong> Addition’ (D–E) -<br />

<strong>and</strong> others referenced in the Bid document - caused us some difficulty <strong>and</strong> these are addressed in<br />

our Technical <strong>Evaluation</strong>, After some experimentation we were happy to proceed with a suitable<br />

range of targets (configuration). Regarding Software QA (H), modifications in COSE largely<br />

leveraged existing java classes <strong>and</strong> infrastructure. The code is available on request but no there<br />

has been no opportunity to QA the new features, or the minor modifications made to D plus.<br />

In terms of ‘Dissemination’ (L) the project was advertised on a number of mailing lists, <strong>and</strong><br />

presentations made to regional VLE user groups (Nov. <strong>and</strong> Dec. ‘05). The outputs of the project<br />

<strong>and</strong> the web site will be further advertised as the project is concluded. Progress plans <strong>and</strong> reports<br />

(M) were made to ELF forums held in April (B’ham) <strong>and</strong> Nov. ’05 (London School of Economics),<br />

in Feb. ‘06 (B’ham University) <strong>and</strong> otherwise (by email <strong>and</strong> telephone).<br />

A further ELF forum focussing on <strong>Resource</strong> <strong>Discovery</strong> is being planned. In respect of ‘Liaison<br />

<strong>and</strong> Feedback to d+’ we met with toolkit developers in Edinburgh at the beginning of July <strong>and</strong> at<br />

the beginning of November ’05 <strong>and</strong> have been in communication with them by telephone <strong>and</strong><br />

email as appropriate. We are grateful for their help, comments <strong>and</strong> feedback on this report (draft,<br />

Apr 06).<br />

<strong>Final</strong>ly, regarding ‘Planning <strong>and</strong> Specification’ (A). We would say that while it may not be unusual<br />

that project plans need to be adjusted in unforeseen circumstances <strong>and</strong> this may not be a bad<br />

thing, our revisions to aims <strong>and</strong> plans were quite substantial <strong>and</strong> as a result we failed in meeting<br />

timelines. A revised list of work packages was submitted 5 .<br />

5 See: http://www.staffs.ac.uk/COSE/<strong>DICE</strong>/Revworkpackages.pdf<br />