15.02.2014 Views

EL280UH Two-Stage Gas Furnace Installation Manual - Lennox

EL280UH Two-Stage Gas Furnace Installation Manual - Lennox

EL280UH Two-Stage Gas Furnace Installation Manual - Lennox

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Vent Pipe<br />

HORIZONTAL LEFT POSITION<br />

Top Vent Discharge<br />

Pressure Switch<br />

Horizontal Position<br />

HORIZONTAL RIGHT POSITION<br />

Top Vent Discharge<br />

Vent Pipe<br />

Pressure Switch<br />

Flue Transition<br />

Flue<br />

Transition<br />

AIR<br />

AIR<br />

Cover Plate<br />

FLOW<br />

FLOW<br />

Collector Box<br />

Cover Plate<br />

<br />

<br />

Make−Up Box<br />

Collector Box<br />

Disconnect pressure switch hose from barbed fitting on the pressure<br />

switch assembly. Remove pressure switch assembly (1<br />

screw) and cut wire tie to free pressure switch wires. Re−install<br />

pressure switch on the other side of orifice plate and re−connect<br />

pressure switch hose.<br />

Re−secure pressure switch wires by either pulling excess wires<br />

through the blower compartment and securing with supplied wire<br />

tie or coil excess wire and secure to the gas manifold.<br />

FIGURE 19<br />

HORIZONTAL LEFT POSITION<br />

Side Vent Discharge<br />

<br />

<br />

<br />

<strong>Gas</strong> supply piping must be brought into the unit from the bottom<br />

in order to accommodate the flue pipe.<br />

Remove make−up box assembly (2 screws) and cut wire tie to<br />

free make−up box wires. Re−install make−up box on other side<br />

of cabinet.<br />

Re−secure make−up box wires by either pulling excess wires<br />

through the blower compartment and securing with supplied<br />

wire tie, or coil excess wire and secure to the gas manifold.<br />

FIGURE 21<br />

Make−Up Box<br />

Pressure Switch<br />

HORIZONTAL RIGHT POSITION<br />

Side Vent Discharge<br />

Pressure Switch<br />

AIR<br />

FLOW<br />

AIR<br />

Flue Transition<br />

FLOW<br />

Flue<br />

Transition<br />

Make−Up Box<br />

Collector Box<br />

<br />

<br />

Disconnect pressure switch hose from barbed fitting on the<br />

pressure switch assembly. Remove pressure switch assembly<br />

(1 screw) and cut wire tie to free pressure switch wires. Re−<br />

install pressure switch on the other side of orifice plate and re−<br />

connect pressure switch hose.<br />

Re−secure pressure switch wires by either pulling excess wires<br />

through the blower compartment and securing with supplied<br />

wire tie, or coil excess wire and secure to the gas manifold.<br />

FIGURE 20<br />

make up box<br />

FIGURE 22<br />

Collector Box<br />