With regard to the small zone of <strong>in</strong>dustrial projects , its area(50 feddans) was<br />
allocated to the small‐scale <strong>in</strong>dustries complex which is affiliated to the<br />
<strong>Industrial</strong> & M<strong>in</strong><strong>in</strong>g Projects Council affiliated to the M<strong>in</strong>istry of Industry &<br />
Foreign Trade. This complex consists of 530 fully occupied units. It is worth<br />
mention<strong>in</strong>g that the <strong>Industrial</strong> & M<strong>in</strong><strong>in</strong>g Projects Council was establish<strong>in</strong>g 16<br />
commercialstore,withanareaof31‐ 32 m 2 for each unit, with charges of<br />
33,000 ‐34,000 for each unit, 50% of which shall be paid <strong>in</strong>stantly , and the<br />
rema<strong>in</strong><strong>in</strong>g amount to be paid over one year. In addition,<br />
the Investors<br />
Association established 128 units (commercial stores) with an area of 20 ‐25m 2<br />
for each unit, with charges of 20,000 ‐25,000<br />
Statement of the executive situation & services <strong>in</strong> the <strong>in</strong>dustrial zone<br />
Zone‘s Utilities<br />
Water & sewerage water: pump station + header tank, & its water‐feed<strong>in</strong>g<br />
power is 2640 m 3 /day, 2376 m 3 of which is allocated to dr<strong>in</strong>k<strong>in</strong>g water & 264<br />
m3 is allocated to <strong>in</strong>dustry.<br />
Sewerage system: water glide l<strong>in</strong>es + pump station, mechanical process<strong>in</strong>g<br />
plant with the capacity of 1000 m 3 /day.<br />
Electric-feed<strong>in</strong>g power<br />
‐The nearest power plants feed<strong>in</strong>g the <strong>in</strong>dustrial zone are the distribution<br />
board at the <strong>Industrial</strong> Complex & the distribution board at the <strong>Industrial</strong><br />
Complex II.<br />
‐ Transformers plant with a capacity of 25,3 MW, <strong>in</strong> addition to one transforms<br />
plant with a capacity of 25.2 MW for each zone.<br />
‐High pressure l<strong>in</strong>e (11 KV) with a capacity of 4 MW <strong>in</strong> length of 8 KM.<br />
‐Lightn<strong>in</strong>g l<strong>in</strong>e of 4 KM & <strong>in</strong> length of 8 KM.<br />
‐Ma<strong>in</strong> road network (with a width of 23.7 M & a length of 9150 M.<br />
‐The road is lead<strong>in</strong>g to the zone is called <strong>Aswan</strong>‐Alaki road.<br />