Industrial Development in Aswan
Industrial Development in Aswan
Industrial Development in Aswan
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Third: Mechanical Projects<br />
32 feddans were allocated for m<strong>in</strong>eral <strong>in</strong>dustry projects<br />
(1) M<strong>in</strong><strong>in</strong>g Industry Projects<br />
No. Project Name Owner Name Activity<br />
1 Cutt<strong>in</strong>g marble<br />
& granite<br />
Marmonil Co.<br />
Cutt<strong>in</strong>g<br />
granite<br />
Area<br />
M 2<br />
Investme<br />
nt Costs<br />
(L.E1000<br />
)<br />
Worke<br />
rs No.<br />
12000 6000 80<br />
2 Marble crusher Saied Elewa<br />
Said<br />
Crush<strong>in</strong>g<br />
marble<br />
300 60 3<br />
3 Manufactur<strong>in</strong>g<br />
marble<br />
Taha Hamada<br />
Hammad<br />
Cutt<strong>in</strong>g 600 300 5<br />
4 Marble &<br />
Mohamed Badr<br />
Cutt<strong>in</strong>g 300 250 6<br />
granite<br />
Moharram<br />
5 Saw<strong>in</strong>g marble<br />
factory<br />
Ezz El D<strong>in</strong> El<br />
Ghazaly<br />
Cutt<strong>in</strong>g &<br />
polish<strong>in</strong>g<br />
960 300 7<br />
6 Mill<strong>in</strong>g &<br />
prepar<strong>in</strong>g<br />
materials<br />
Mostafa Abdel<br />
Mohsen<br />
Mill<strong>in</strong>g<br />
materials<br />
3000 800 25<br />
Source: Al-Alaki <strong>Industrial</strong> Zone Dep.<br />
Total exploited area: 17160 m 2 .<br />
Total <strong>in</strong>vestment costs: L.E 7.71 million<br />
Total labour No.: 126<br />
Total No. of productive projects: 3 projects with<strong>in</strong> 2009<br />
(Marmonil Co.-Marble crusher- Taha Hamada Hammad)<br />
15