t-cAM Consulting in association with<br />
<strong>Water</strong> Futures Pty Ltd and iConneXX Pty Ltd<br />
Appendix 8 Environment Indicators and Management Detailed <strong>Audit</strong> Findings (Part 7)<br />
Clause/<br />
Scope<br />
7.2.2<br />
SC<br />
7.2.3<br />
SC<br />
7.2.4<br />
<strong>Audit</strong><br />
Operating Licence Obligation Risk Target for Full Compliance <strong>2010</strong>/<strong>11</strong><br />
After that <strong>Hunter</strong> <strong>Water</strong> must produce<br />
further Environment Management Plans<br />
every 5 years.<br />
<strong>Hunter</strong> <strong>Water</strong> must engage in Public<br />
Consultation in developing an<br />
Environmental Management Plan.<br />
The Environmental Management Plan must:<br />
<br />
<br />
<br />
<br />
contain details of <strong>Hunter</strong> <strong>Water</strong>’s<br />
environmental improvement strategies<br />
and objectives for its catchments,<br />
<strong>Water</strong> Storages, <strong>Water</strong> Supply System,<br />
Sewerage System, and Drainage<br />
System, as well as the environmental<br />
aspects of its other activities such as<br />
energy management, waste<br />
minimisation and heritage;<br />
endorse ESD principles;<br />
be integrated into <strong>Hunter</strong> <strong>Water</strong>’s<br />
business plans;<br />
incorporate the objectives of the<br />
energy management plan of <strong>Hunter</strong><br />
<strong>Water</strong> to:<br />
– develop and implement energy<br />
savings plans for major facilities;<br />
– develop a greenhouse gas<br />
emissions strategy; and<br />
– comply with all relevant energy<br />
related regulation.<br />
The Environmental Management Plan must<br />
set targets and timetables for<br />
environmental activities to be undertaken<br />
by <strong>Hunter</strong> <strong>Water</strong> over the term of the<br />
Environmental Management Plan.<br />
Moderate Risk.<br />
Adequate<br />
environmental<br />
planning and<br />
management is an<br />
important<br />
The Environmental<br />
Management Plan has targets<br />
and timetables for<br />
environmental activities to be<br />
undertaken by <strong>Hunter</strong> <strong>Water</strong><br />
over the term of the<br />
<strong>Audit</strong><br />
Grade<br />
Full<br />
Evidence:<br />
<strong>Audit</strong>or commentary<br />
Interview at <strong>Hunter</strong> <strong>Water</strong> (Honeysuckle Drive Office) 20/09/20<strong>11</strong><br />
with Environment and Sustainability Manager, Cadet Civil Engineer,<br />
Team Leader for Dams and Catchment and <strong>Water</strong> Quality Scientist by<br />
Annette Davison (auditor) with Dr Kaye Power and Jessica Hanna<br />
(<strong>IPART</strong>) attending.<br />
<strong>11</strong>0 <strong>Hunter</strong> <strong>Water</strong> <strong>Corporation</strong> <strong>Operational</strong> <strong>Audit</strong> <strong>2010</strong>/<strong>11</strong> Appendices