Report
Report
Report
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
- 59 -<br />
introducing the regulatory regime in the first<br />
instance, given the retention of the re-registration<br />
system in parallel with the new OGP route. The<br />
need for Option A(i) may be reviewed in the longer<br />
term subject to the future development of the patent<br />
system in Hong Kong.<br />
(c)<br />
Interim measures to be developed should have<br />
regard to the existing patent agency services being<br />
provided on the one hand (e.g. through appropriate<br />
grandfathering provisions) and the early building<br />
and recognition of a regulated patent agency<br />
profession on the other (e.g. through Option B or a<br />
list or register of patent agents with their<br />
qualifications).<br />
5.26 Subject to the Administration’s decision on the way forward,<br />
the Advisory Committee will further explore the detailed implementation<br />
issues in the next phase of the review, including accreditation,<br />
professional discipline, transitional and interim arrangements,<br />
implementation timetable and consultation plans.