(d)<br />

(e)<br />

(f)<br />

(g)<br />

(h)<br />

(i)<br />

(j)<br />

Request for Proposal<br />

Key Personnel have been proposed only if they meet the Conditions of<br />

Eligibility laid down at Clause 2.2.2 (D) of the RFP;<br />

no alternative proposal for any Key Personnel is being made and only<br />

one CV for each position has been furnished;<br />

the CVs have been recently signed and dated, in blue ink by the<br />

respective Personnel and countersigned by the Applicant. Photocopy or<br />

unsigned / countersigned CVs shall be rejected;<br />

the CVs shall contain an undertaking from the respective Key Personnel<br />

about his/her availability for the duration specified in the RFP;<br />

Key Personnel proposed have good working knowledge of English<br />

language;<br />

Key Personnel would be available for the period indicated in the TOR;<br />

no Key Personnel should have attained the age of 70 years at the time of<br />

submitting the proposal; and<br />

(k) the proposal is responsive in terms of Clause 2.21.3.<br />

2.14.3 Failure to comply with the requirements spelt out in this Clause 2.14 shall<br />

make the Proposal liable to be rejected.<br />

2.14.4 If an individual Key Personnel makes a false averment regarding his<br />

qualification, experience or other particulars, he shall be liable to be debarred<br />

for any future assignment of the Authority for a period of 3 (three) years. The<br />

award of this Consultancy to the Applicant may also be liable to cancellation<br />

in such an event.<br />

2.14.5 The Technical Proposal shall not include any financial information relating to<br />

the Financial Proposal.<br />

2.14.6 The proposed team shall include experts and specialists (the “Professional<br />

Personnel”) in their respective areas of expertise and managerial/support staff<br />

(the “Support Personnel”) such that the Consultant should be able to<br />

complete the Consultancy within the specified time schedule. The Key<br />

Personnel specified in Clause 2.1.4 shall be included in the proposed team of<br />

Professional Personnel. The team shall comprise other competent and<br />

experienced professional personnel in the relevant areas of expertise (where<br />

applicable) as required for successful completion of this Consultancy. The CV<br />

of each such professional personnel, if any, should also be submitted in the<br />

format at Form-11 of Appendix-I.<br />

2.14.7 An Applicant may, from time to time, if it considers necessary, propose<br />

suitable Sub-Consultants in specific areas of expertise (where applicable).<br />

Credentials of such firms should be submitted by the Applicant in Form-12 of<br />

Appendix-I. A Sub-Consultant, however, shall not be a substitute for any Key<br />

Personnel.<br />

RFP for Financial Consultant: <strong>Hyderabad</strong> <strong>Metro</strong> <strong>Rail</strong> (MRTS) Project 15