<strong>Caledonian</strong> ward width restrictions<br />

Category: Transport and streetscape<br />

Sub-category: Road safety<br />

Priority: 2 - Medium<br />

Approx cost: £300,000<br />

Funds secured: £0<br />

Implement new camera enforced width restrictions at<br />

strategic locations to enforce <strong>the</strong> existing 7.5 tonne<br />

lorry ban scheme in <strong>the</strong> area. It will help to ensure<br />

lorries use <strong>the</strong> main roads that are designed to carry<br />

larger vehicles and not localised residential streets.<br />

These measures are to assist in <strong>the</strong> enforcement<br />

of <strong>the</strong> existing 7.5 tonne lorry ban around <strong>the</strong><br />

Copenhagen Street area, by providing permanent,<br />

physical enforcement.<br />

Copenhagen School - multi-purpose area<br />

Category: Community facilities<br />

Sub-category: School <strong>improvement</strong>s<br />

Priority: 2 - Medium<br />

Approx cost: £25,000<br />

Funds secured: £0<br />

Multi-purpose outside area on canal side of school,<br />

including:<br />

* Covered waiting area with notice board, seating and<br />

<strong>plan</strong>ting, as an extension of <strong>the</strong> Learning Lounge<br />

currently being delivered<br />

* A quiet area where children from both <strong>the</strong> nursery<br />

and <strong>the</strong> school can have lessons or study<br />

independently<br />

* Conversion of an old outbuilding into learning space,<br />

possibly an art room<br />

Copenhagen School - new science area<br />

Category: Community facilities<br />

Sub-category: School <strong>improvement</strong>s<br />

Priority: 2 - Medium<br />

Approx cost: £40,000<br />

Funds secured: £0<br />

Development of <strong>the</strong> roof space, including:<br />

* Creation of a large classroom with glass doors to<br />

create a science area<br />

* Refurbishment including new windows, plastering of<br />

walls, floors etc<br />

To create a very large classroom with <strong>the</strong> whole of<br />

one side made of glass so <strong>the</strong> children could study<br />

nature and o<strong>the</strong>r aspects of science at close<br />

quarters but from a safe, warm environment.<br />

24 June 2013 Page 38