4. Inst<strong>all</strong>ation<br />

After the upper section has been set to its final elevation and<br />

slope, it is important to note the following:<br />

• Cobble stone inst<strong>all</strong>ation<br />

• in the case that the upper section and cover will be inst<strong>all</strong>ed<br />

in a stone / cobble stone surface, it is important that the<br />

top of the upper section is inst<strong>all</strong>ed approx 2 cm higher than<br />

that of the cobble stones. When the cobble stones are compacted<br />

the upper section (with inst<strong>all</strong>ed cover) should also<br />

be compacted (be sure to tighten cover screws before compacting)<br />

until it is level with the surrounding stones<br />

• Inst<strong>all</strong>ation in automobile traffic areas<br />

• in the case that the upper section and cover will be inst<strong>all</strong>ed<br />

in a surface which is to handle Class D (40.0 metric ton<br />

load classes), a 18cm thick, 2m x 2m B25 concrete support<br />

plate must be poured around the upper section. The concrete<br />

support plate should be steel re-enforced and comply<br />

with any local regulations. A drawing of this load support<br />

plate is available from <strong>KESSEL</strong> upon request.<br />

•„In some instances it may be required that the lower section<br />

of the upper section be sawed off in order to obtain the correct<br />

inst<strong>all</strong>ation depth. This cut should be made as evenly<br />

as possible and any remaining loose edges should be filed<br />

away. The included manhole cover removal key as well as<br />

the User´s Manual for the pumping system should be stored<br />

in a protected dry area in the near vacinity of the control<br />

unit.<br />

Inst<strong>all</strong>ation depths<br />

<strong>KESSEL</strong> – <strong>Pumpstation</strong> Aqualift F in 1000 Inspection Chamber<br />

Inst<strong>all</strong>ation depths from 1.63 to 5.13 meters<br />

<strong>KESSEL</strong> – <strong>Pumpstation</strong> Aqualift F in 800 Inspection Chamber<br />

Inst<strong>all</strong>ation depths from 1.46 to 1.96 meters<br />