Kadanwari Gas Field Facilities - Pakistan<br />
Zamzama Field<br />
(KUFPEC: 9.375%)<br />
Gas production in 2010 from the Zamzama field<br />
averaged 5,747 boepd. The production was low<br />
compared to 2009 due to operational problems<br />
related to the Phase II expansion project, and<br />
the shut-in wells due to heavy flooding in the<br />
area. Also the Zamzama-3 well was shut-in due<br />
to water loading. The Phase II project is still in<br />
the commissioning stage and currently processing<br />
90 mmscfpd. The Front End Compression<br />
project is progressing as per schedule and<br />
expected to produce first gas by July 2011.<br />
Zarghun South<br />
(KUFPEC: 3.75%)<br />
Gas delivery is currently pending on the execution<br />
of a Gas Purchase Agreement (GPA) by the<br />
Directorate General (Gas). The project became<br />
uneconomical due to escalation of the field<br />
development costs. To render the project economics,<br />
the operator is in discussions with the<br />
government to change the gas price mechanism.<br />