AUSTRALIA<br />
Harriet Joint Venture<br />
(KUFPEC: 19.28%)<br />
Net production in the Harriet Joint Venture averaged<br />
3,591 boepd in 2010 compared to 3,479<br />
boepd in 2009. This total was achieved despite the<br />
complete absence of drilling activity in 2010.<br />
Three new wells and a new 3D seismic survey<br />
have been budgeted for 2011.<br />
Mutineer Field - Australia<br />
Mutineer Exeter Field<br />
(KUFPEC: 33.4%)<br />
During 2010, net production in the Mutineer-<br />
Exeter Field declined to 1,724 boepd compared<br />
to 2,736 boepd in 2009. This decline was the result<br />
of the failures of the down hole submersible<br />
pumps installed on the producing wells. As a<br />
WA-356-P<br />
(KUFPEC: 35%)<br />
In 2010, exploration and appraisal drilling continued<br />
in the Julimar and Brunello areas. Successful<br />
wells drilled in 2010 were Julimar SW-1, Julimar<br />
SW-2, Balnaves-3 and Balnaves-4. The Balnaves oil<br />
development is to be evaluated as a separate project<br />
and a further delineation well, the Balnaves<br />
Deep-1 well, has been scheduled for drilling in<br />
early 2011. The Balnaves FEED study for a possible<br />
oil development in B20 sandstone is to be initiated<br />
in 2011.<br />
consequence of this, the producing wells were<br />
initially shut-in but some were later started<br />
on free flow production at reduced rates. Two<br />
work-overs scheduled for 2010 were delayed<br />
into 2011 when a rig will be available.<br />
The Joint Venture finalized the location of the 5<br />
graticular blocks for the Production License and<br />
Development Plan Application for WA-356-P.<br />
The blocks were approved by the Government.<br />
The Preliminary Development Plan for WA-<br />
356-P, which is to supply gas to Wheatstone<br />
LNG Development, was completed and submitted<br />
to the Government. This Plan contained the<br />
key Class 2.5 Cost Estimate.<br />