KUFPEC intends to develop the WA-356-P gas reserves<br />

through the Wheatstone LNG project. Several<br />

project milestones and key elements were<br />

achieved during 2010 in preparation for the Final<br />

Investment Decision into the Wheatstone LNG<br />

hub which will be operated by Chevron.<br />

Serveral Wheatstone LNG Project Agreements<br />

were signed at a ceremony that took place 9th December<br />

in Perth.<br />

In 2010, several LNG purchasers commenced due<br />

Yacheng Field<br />

(KUFPEC: 14.7%)<br />

KUFPEC net production during 2010 was 7,179<br />

boepd compared to 6,369 boepd in 2009. Increased<br />

production was due to offtaker demand.<br />

4 additional wells were drilled in 2010 to maintain<br />

production levels. Negotiations were also completed<br />

with CNOOC regarding the Y13-4 and Y13-<br />

6 tie-in to Yacheng Field platform. This will allow<br />

CNOOC to increase its production from the surdiligence<br />

and negotiations on LNG Sales and<br />

Equity Purchase with the WA-356 Joint Venturers.<br />

As a result of this, a number of Heads of<br />

Agreements have been finalized and signed.<br />

LNG Sales and Equity Purchase meetings will<br />

continue with LNG off-takers in 2011.<br />

To comply with State regulations, the Wheatstone<br />

Environmental Impact Study was released<br />

for public comment in late 2010. In 2010 also<br />

witnessed the signature of Wheatstone Native<br />

Title Agreements.<br />

WA-191-P<br />

(KUFPEC: 33.4%)<br />

The exploration well Finucane South-1 is scheduled<br />

for drilling in mid 2011. This well will delineate<br />

additional possible reserves which will form<br />

WA-335-P<br />

(KUFPEC: 24.5%)<br />

This Permit was partially farmed-out to BHP in<br />

2009. As part of the farm-out agreement, BHP ac-<br />

PHILIPPINES<br />

SC-60<br />

(KUFPEC: 30%)<br />

The exploration well Silangan-1ST was drilled in<br />

Q3 2010. It failed to discover hydrocarbons. Operator,<br />

Shell Philippines, acquired a CSEM (Con-<br />

China<br />

the basis of a joint development of the Fletcher<br />

oil discovery. If successful, the development<br />

project may be tied-back to Mutineer-Exeter<br />

Field.<br />

quired a new 3D seismic survey 2010. A decision<br />

will be made in 2011 whether to drill a well.<br />

trolled Source Electromagnetic Survey) in late<br />

2010 to be evaluated in 2011 for the remaining<br />

potential on the block.<br />

rounding area and for Yacheng Joint Venture<br />

Partners to receive tariffs for facility utilization.<br />

A liquid gas manufacturing facility was constructed<br />

during 2010 on Hainan Island and the<br />

LPG sale contract concluded, with the first cargo<br />

scheduled for the first half of 2011.<br />

23