Annual Bulletin 2009 - Ministry of Works and Human Settlement
Annual Bulletin 2009 - Ministry of Works and Human Settlement
Annual Bulletin 2009 - Ministry of Works and Human Settlement
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Annual</strong> Information <strong>Bulletin</strong> <strong>2009</strong><br />
Table 2.7 Motor-able Bridges by type as <strong>of</strong> June <strong>2009</strong><br />
SN Type <strong>of</strong> bridges Nos Length (m)<br />
% by<br />
number<br />
% by<br />
length<br />
1 RC T-Beam 59 1,156.30 21.85 14.53<br />
2 RC Slab 29 521.25 10.74 6.55<br />
3 Pre-Stressed Concrete 7 376.00 2.59 4.72<br />
4 RC Arch 3 265.00 1.11 3.33<br />
5 Composite 19 331.06 7.04 4.16<br />
6 Bailey & Bailey Suspension 113 3,497.03 41.85 43.94<br />
7 Steel Pony Truss 4 190.00 1.48 2.39<br />
8 Steel Langer Arch 5 424.45 1.85 5.33<br />
9 Steel Hemilton 10 313.60 3.70 3.94<br />
10 Steel Truss/Girder 11 641.60 4.07 8.06<br />
11 Multi Cell Box Culvert 3 48.00 1.11 0.60<br />
12 Submersible 7 193.50 2.59 2.43<br />
Source: DoR<br />
Total 270 7,957.79 100.00 100.0<br />
Table 2.8 Total Number <strong>of</strong> Permanent & Semi-Permanent bridges as <strong>of</strong> June <strong>2009</strong><br />
% by % by<br />
SN Type <strong>of</strong> bridges Nos Length (m)<br />
number length<br />
1 Total Permanent bridges 157 4,460.76 58.15 54.83<br />
2 Total Temporary bridges 113 3,497.03 41.85 45.16<br />
Source: DoR<br />
Total No <strong>of</strong> bridges 270 7,957.79 100.00 99.99<br />
14