06.04.2014 Views

Annual Bulletin 2009 - Ministry of Works and Human Settlement

Annual Bulletin 2009 - Ministry of Works and Human Settlement

Annual Bulletin 2009 - Ministry of Works and Human Settlement

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Annual</strong> Information <strong>Bulletin</strong> <strong>2009</strong><br />

Table 2.7 Motor-able Bridges by type as <strong>of</strong> June <strong>2009</strong><br />

SN Type <strong>of</strong> bridges Nos Length (m)<br />

% by<br />

number<br />

% by<br />

length<br />

1 RC T-Beam 59 1,156.30 21.85 14.53<br />

2 RC Slab 29 521.25 10.74 6.55<br />

3 Pre-Stressed Concrete 7 376.00 2.59 4.72<br />

4 RC Arch 3 265.00 1.11 3.33<br />

5 Composite 19 331.06 7.04 4.16<br />

6 Bailey & Bailey Suspension 113 3,497.03 41.85 43.94<br />

7 Steel Pony Truss 4 190.00 1.48 2.39<br />

8 Steel Langer Arch 5 424.45 1.85 5.33<br />

9 Steel Hemilton 10 313.60 3.70 3.94<br />

10 Steel Truss/Girder 11 641.60 4.07 8.06<br />

11 Multi Cell Box Culvert 3 48.00 1.11 0.60<br />

12 Submersible 7 193.50 2.59 2.43<br />

Source: DoR<br />

Total 270 7,957.79 100.00 100.0<br />

Table 2.8 Total Number <strong>of</strong> Permanent & Semi-Permanent bridges as <strong>of</strong> June <strong>2009</strong><br />

% by % by<br />

SN Type <strong>of</strong> bridges Nos Length (m)<br />

number length<br />

1 Total Permanent bridges 157 4,460.76 58.15 54.83<br />

2 Total Temporary bridges 113 3,497.03 41.85 45.16<br />

Source: DoR<br />

Total No <strong>of</strong> bridges 270 7,957.79 100.00 99.99<br />

14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!