Conduit and Knockout Preparation<br />

Planning<br />

Knockouts (two 1”, one 2”) are provided on the ends of the AC and DC enclosures for routing cable<br />

into the enclosures. Conduit and bushings are recommended to prevent damage to conductors from<br />

sharp edges along knockout holes.<br />

1. Remove the 2” knockout on the DC end to accommodate the larger battery cables and Remote<br />

Temperature Sensor cable.<br />

2. Remove the 1” knockout(s) on the AC end to accommodate the AC cabling.<br />

3. Install conduit and bushings to protect the cable from damage from the sharp edges of the hole.<br />

4. Ensure no debris or metal shavings have fallen into the enclosures.<br />

AC End<br />

1”<br />

2”<br />

Top View<br />

Front Side<br />

Front Side<br />

Bottom View<br />

1” 2”<br />

DC End<br />

Figure 8<br />

Conduit and Knockout Preparation<br />

20 900-0095-01-00 Rev A