06 16 00 – SHEATHING<br />

October 5, 2012<br />

1. Apply horizontally with a 2-inch overlap and a 6-inch end lap.<br />

2. Fasten to sheathing with galvanized staples or roofing nails.<br />

3.5 PROTECTION<br />

A. Gypsum Sheathing:<br />

1. Protect sheathing by covering exposed exterior surface of sheathing with air infiltration barrier<br />

sheet securely fastened to framing.<br />

2. Apply covering as soon as possible after sheathing is installed.<br />

END OF SECTION<br />

06 16 00 – SHEATHING<br />