Environmental Assessment – <strong>Bulk</strong> <strong>Liquids</strong> <strong>Berth</strong> #2 <strong>Port</strong> <strong>Botany</strong><br />

TABLES<br />

Table 2-1 Licences and Approvals Required<br />

Table 3-1 <strong>Berth</strong> Utilisation (BLB1 only)<br />

Table 3-2 Expected Total Import and Export Volumes (kL) for <strong>Port</strong> <strong>Botany</strong><br />

Table 3-3 Projected berth utilisation for BLB1 and BLB2<br />

Table 3-4 BLB1 Maximum discharge rates<br />

Table 4-1 Expected Delivery <strong>of</strong> Chemicals Volumes (kL) for <strong>Port</strong> <strong>Botany</strong><br />

Table 4-2 Expected Gas Volumes (kL) for <strong>Port</strong> <strong>Botany</strong> (BLB1 + BLB2)<br />

Table 4-3 Expected Gas Volumes (kL) for BLB2 only<br />

Table 4-4 Expected Biodiesel Volumes (kL) for <strong>Port</strong> <strong>Botany</strong> (BLB1 + BLB2) and BLB2 only<br />

Table 4-5 Expected Petroleum Volumes (kL) for <strong>Port</strong> <strong>Botany</strong> (BLB1 + BLB2)<br />

Table 4-6 Expected Petroleum Volumes (kL) for BLB2 only<br />

Table 5-1 Proposed Dangerous Goods for Transfer and Handling at BLB2<br />

Table 5-2 Hazard identification at BLB2<br />

Table 5-3 Impact Distances <strong>of</strong> Incidents at BLB2<br />

Table 5-4 Summary <strong>of</strong> Probit Analysis Applied to Incidents at BLB2<br />

Table 5-5 Frequency Analysis <strong>of</strong> Incidents<br />

Table 5-6 Summary <strong>of</strong> Fatality Probability, Incident Frequency and Risk Results<br />

Table 5-7 Ground Level Impact Assessment Criteria (DECC, 2005)<br />

Table 5-8 BLB Emission Estimations<br />

Table 5-9 Summary <strong>of</strong> Emissions for All Source Groups<br />

Table 5-10 Modelled NO2 Concentrations at Discrete Receptors (μg/m3)<br />

Table 5-11 Modelled SO2 Concentrations at Discrete Receptors (μg/m3)<br />

Table 5-12 Modelled PM10 Concentrations at Discrete Receptors (μg/m3)<br />

Table 5-13 Fugitive VOC Emission Factors and Calculations<br />

Table 5-14 <strong>No</strong>ise Monitoring Locations<br />

Table 5-15 Summary <strong>of</strong> Attended <strong>No</strong>ise Monitoring<br />

Table 5-16 Summary <strong>of</strong> Background <strong>No</strong>ise Monitoring<br />

Table 5-17: DECC Construction Criteria Guidelines<br />

Table 5-18 Derivation <strong>of</strong> Project Specific <strong>No</strong>ise Criterion Yarra Road<br />

Table 5-19 Construction <strong>No</strong>ise Objectives<br />

Table 5-20 Ship Unloading Sound Power Level<br />

Table 5-21 Predicted <strong>No</strong>ise Levels<br />

Table 5-22 Predicted <strong>No</strong>ise Levels BLB1 and BLB2 Combined<br />

Table 5-23 Sound Power Levels for Construction Activities<br />

Table 5-24 Predicted Construction <strong>No</strong>ise Levels<br />

Table 5-25 Management Practices for Construction Activities<br />

Table 6-1 Economic value <strong>of</strong> bulk liquids and gas at SPC <strong>Port</strong>s<br />

SINCLAIR KNIGHT MERZ<br />

PAGE vi<br />

I:\ENVR\Projects\EN02254\Deliverables\BLB2 Environmental Assessment (DoP).doc