Development <strong>of</strong> Mineral Terminal in the Port <strong>of</strong> Lobito<br />

Year 2010 2015 2020<br />

Throughput Forecast 2,000,000 tons 3,600,000 tons 6,600,000 tons<br />

Construction Items<br />

A 310m long<br />

Mineral Terminal<br />

A 310m long<br />

Mineral Terminal<br />

Another planned<br />

Mineral Terminal<br />

Marine Structure For 100,000 DWT For 100,000 DWT For 100,000 DWT<br />

Water Depth<br />

For 50,000 DWT<br />

For 100,000 DWT<br />

For 100,000 DWT<br />

(-14.1m)<br />

(-15.5m)<br />

H<strong>and</strong>ling Equipment<br />

See Table 8-4 in<br />

Preliminary<br />

Design Re<strong>port</strong><br />

See Table 8-4 in<br />

Preliminary<br />

Design Re<strong>port</strong><br />

Design Throughput<br />

Capacity <strong>of</strong> the Port<br />

<strong>of</strong> Lobito<br />

2,850,000 tons 3,650,000 tons About 11,650,000<br />

tons<br />

Cost Estimate 483.9 million USD 71.75 million USD