Development <strong>of</strong> Mineral Terminal in the Port <strong>of</strong> Lobito<br />
Year 2010 2015 2020<br />
Throughput Forecast 2,000,000 tons 3,600,000 tons 6,600,000 tons<br />
Construction Items<br />
A 310m long<br />
Mineral Terminal<br />
A 310m long<br />
Mineral Terminal<br />
Another planned<br />
Mineral Terminal<br />
Marine Structure For 100,000 DWT For 100,000 DWT For 100,000 DWT<br />
Water Depth<br />
For 50,000 DWT<br />
For 100,000 DWT<br />
For 100,000 DWT<br />
(-14.1m)<br />
(-15.5m)<br />
H<strong>and</strong>ling Equipment<br />
See Table 8-4 in<br />
Preliminary<br />
Design Re<strong>port</strong><br />
See Table 8-4 in<br />
Preliminary<br />
Design Re<strong>port</strong><br />
Design Throughput<br />
Capacity <strong>of</strong> the Port<br />
<strong>of</strong> Lobito<br />
2,850,000 tons 3,650,000 tons About 11,650,000<br />
tons<br />
Cost Estimate 483.9 million USD 71.75 million USD