H<strong>and</strong>ling Equipment at Container Quay<br />

NO. Name Unit<br />

Quantity<br />

In short-term (In 2010) In long-term (In 2015)<br />

1 Multi-purpose Portal Crane set 2 -<br />

2 Container bridge crane set 1 +2<br />

3 Rubber-tyred Gantry Cranes set 4 +4<br />

4 Container reach stacker set 1 +1<br />

5 Empty container h<strong>and</strong>ler set 2 +1<br />

6 Container Tractor set 10 +5<br />

7 Container Trailer set 12 +6<br />

8 Rail-mounted Gantry Cranes set 2 +2<br />

9 Weighbridge set 2 +2