H<strong>and</strong>ling Equipment at Container Quay<br />
NO. Name Unit<br />
Quantity<br />
In short-term (In 2010) In long-term (In 2015)<br />
1 Multi-purpose Portal Crane set 2 -<br />
2 Container bridge crane set 1 +2<br />
3 Rubber-tyred Gantry Cranes set 4 +4<br />
4 Container reach stacker set 1 +1<br />
5 Empty container h<strong>and</strong>ler set 2 +1<br />
6 Container Tractor set 10 +5<br />
7 Container Trailer set 12 +6<br />
8 Rail-mounted Gantry Cranes set 2 +2<br />
9 Weighbridge set 2 +2