rehabilitation and extension project for port of lobito - PMAESA
rehabilitation and extension project for port of lobito - PMAESA
rehabilitation and extension project for port of lobito - PMAESA
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Development Target<br />
(1) A hinge <strong>of</strong> l<strong>and</strong>/water trans<strong>port</strong>ation <strong>for</strong> middle south <strong>of</strong> Angola,<br />
even <strong>for</strong> the inl<strong>and</strong> neighbors;<br />
(2) A big <strong>port</strong> with advanced infrastructure <strong>and</strong> modern h<strong>and</strong>ling<br />
equipments;<br />
(3) A center <strong>port</strong> <strong>of</strong> luxury cruise <strong>for</strong> middle south <strong>of</strong> Angola;<br />
(4) Port Lobito should be able to im<strong>port</strong> the general cargo <strong>and</strong><br />
containers, ex<strong>port</strong> the minerals, also trans<strong>port</strong> the incoming<br />
crude oil <strong>and</strong> outgoing refined oil <strong>for</strong> the proposed refinery.