28.05.2014 Views

21 Murchison Street St Kilda East - City of Port Phillip

21 Murchison Street St Kilda East - City of Port Phillip

21 Murchison Street St Kilda East - City of Port Phillip

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

STATUTORY PLANNING COMMITTEE<br />

17 APRIL 2012<br />

a) The site at a scale <strong>of</strong> 1:100/200, including site boundaries, existing and<br />

proposed buildings, neighbouring buildings, car parking, access and exit<br />

points, indicative topography and spot levels at the site corners, existing and<br />

proposed vegetation, nature strip trees, easements and landscape setbacks<br />

b) Details <strong>of</strong> the proposed layout, type, and height <strong>of</strong> fencing and associated<br />

screening structures<br />

c) A legend <strong>of</strong> all plant types, surfaces, materials and landscape items to be<br />

used, including the total areas <strong>of</strong> garden and lawn<br />

d) A plant schedule giving a description <strong>of</strong> botanical name, common name,<br />

mature height and spread, pot size, purchase height (if a tree) and individual<br />

plant quantities<br />

e) All new trees nominated with a minimum planting height <strong>of</strong> 1.5m<br />

f) Any paving or deck areas nominated to be on a permeable base<br />

all to the satisfaction <strong>of</strong> the Responsible Authority.<br />

7. Sustainable Design Assessment<br />

Before the development commences a Sustainable Design Assessment (SDA)<br />

that outlines proposed sustainable design initiatives must be submitted to and<br />

approved by the Responsible Authority. Upon approval the SDA will be endorsed<br />

as part <strong>of</strong> the planning permit and the project must incorporate the sustainable<br />

design initiatives listed.<br />

8. Piping and ducting<br />

All piping and ducting (excluding down pipes, guttering and rainwater heads) must<br />

be concealed to the satisfaction <strong>of</strong> the Responsible Authority.<br />

9. No equipment or services<br />

Any plant, equipment or domestic services visible from a street (other than a lane)<br />

or public park must be located and visually screened to the satisfaction <strong>of</strong> the<br />

Responsible Authority.<br />

10. Time for starting and completion<br />

This permit will expire if one <strong>of</strong> the following circumstances applies:<br />

a) The development is not started within two years <strong>of</strong> the date <strong>of</strong> this permit.<br />

b) The development is not completed within two years <strong>of</strong> the date <strong>of</strong><br />

commencement <strong>of</strong> works.<br />

The Responsible Authority may extend the periods referred to if a request is made<br />

in writing before the permit expires or within three months afterwards.<br />

Permit Notes:<br />

Building Approval Required<br />

This permit does not authorise the commencement <strong>of</strong> any building construction<br />

works. Before any such development may commence, the applicant must apply<br />

for and obtain appropriate building approval.<br />

<br />

Building Works to Accord With Planning Permit<br />

The applicant/owner will provide a copy <strong>of</strong> this planning permit to any appointed<br />

Building Surveyor. It is the responsibility <strong>of</strong> the applicant/owner and Building<br />

Surveyor to ensure that all building development works approved by any building<br />

permit is consistent with this planning permit.<br />

28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!