03.06.2014 Views

Measurement in the Capability Maturity Model Integration (CMMI)

Measurement in the Capability Maturity Model Integration (CMMI)

Measurement in the Capability Maturity Model Integration (CMMI)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Measurement</strong> <strong>in</strong> <strong>CMMI</strong><br />

<strong>Measurement</strong> & Analysis Process Area–<br />

Level 2<br />

PA Purpose<br />

The purpose of <strong>Measurement</strong> and Analysis is to develop<br />

and susta<strong>in</strong> a measurement capability <strong>in</strong> support of<br />

management <strong>in</strong>formation needs.<br />

<strong>Measurement</strong> <strong>in</strong>volves:<br />

• identify<strong>in</strong>g <strong>the</strong> goals and issues regard<strong>in</strong>g <strong>the</strong> scope of measurement<br />

and analysis such that it is aligned to <strong>the</strong> bus<strong>in</strong>ess goals of <strong>the</strong><br />

organization<br />

• def<strong>in</strong><strong>in</strong>g <strong>the</strong> measures to be used, <strong>the</strong> collection process, <strong>the</strong> storage<br />

mechanism, <strong>the</strong> analysis process, <strong>the</strong> report<strong>in</strong>g process and <strong>the</strong><br />

feedback process<br />

• collect<strong>in</strong>g and stor<strong>in</strong>g data<br />

• analyz<strong>in</strong>g <strong>the</strong> data<br />

• present<strong>in</strong>g <strong>the</strong> data<br />

Pg. 41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!