03.06.2014 Views

Measurement in the Capability Maturity Model Integration (CMMI)

Measurement in the Capability Maturity Model Integration (CMMI)

Measurement in the Capability Maturity Model Integration (CMMI)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Measurement</strong> <strong>in</strong> <strong>CMMI</strong><br />

Matur<strong>in</strong>g <strong>the</strong> M & A Process Area<br />

<strong>Capability</strong> Level 2 Generic Practices (cont.):<br />

- (PcM-GP 2.9) (Objectively Verify Adherence) Objectively verify<br />

adherence of <strong>the</strong> planned process, <strong>in</strong>-use process, and <strong>the</strong>ir work<br />

products to <strong>the</strong> applicable requirements and standards, and<br />

address non-compliance.<br />

- (PcM-GP 2.10) (Review Activities and Results with Management)<br />

Review <strong>the</strong> activities, status, and results of <strong>the</strong> <strong>in</strong>-use process<br />

with management and resolve issues.<br />

Pg. 51

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!