Measurement in the Capability Maturity Model Integration (CMMI)
Measurement in the Capability Maturity Model Integration (CMMI)
Measurement in the Capability Maturity Model Integration (CMMI)
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Measurement</strong> <strong>in</strong> <strong>CMMI</strong><br />
Matur<strong>in</strong>g <strong>the</strong> M & A Process Area<br />
<strong>Capability</strong> Level 2 Generic Practices:<br />
- (PcM-GP 2.1) (Establish Organizational Policy) Establish and<br />
ma<strong>in</strong>ta<strong>in</strong> a written organizational policy for plann<strong>in</strong>g and<br />
perform<strong>in</strong>g <strong>the</strong> process.<br />
- (PcM-GP 2.2) (Plan <strong>the</strong> Process) Establish and ma<strong>in</strong>ta<strong>in</strong> <strong>the</strong> plan<br />
for perform<strong>in</strong>g <strong>the</strong> process.<br />
- (PcM-GP 2.3) (Provide Resources) Provide adequate resources<br />
for perform<strong>in</strong>g <strong>the</strong> planned process.<br />
- (PcM-GP 2.4) (Assign Responsibility) Assign responsibility and<br />
authority for perform<strong>in</strong>g <strong>the</strong> planned process.<br />
- (PcM-GP 2.5) (Tra<strong>in</strong> people) Tra<strong>in</strong> <strong>the</strong> people perform<strong>in</strong>g or<br />
support<strong>in</strong>g <strong>the</strong> planned process as needed.<br />
Pg. 49