03.06.2014 Views

Measurement in the Capability Maturity Model Integration (CMMI)

Measurement in the Capability Maturity Model Integration (CMMI)

Measurement in the Capability Maturity Model Integration (CMMI)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Measurement</strong> <strong>in</strong> <strong>CMMI</strong><br />

<strong>Measurement</strong> & Analysis Process Area<br />

Goal 1. <strong>Measurement</strong> components are<br />

established <strong>in</strong> alignment with <strong>in</strong>formation<br />

needs and objectives.<br />

• SP 1.1. Establish and ma<strong>in</strong>ta<strong>in</strong> measurement<br />

objectives.<br />

• SP 1.2. Identify and def<strong>in</strong>e measures and <strong>in</strong>dicators.<br />

• SP 1.3. Def<strong>in</strong>e how primitive and derived measures<br />

will be obta<strong>in</strong>ed (produced and collected) and stored.<br />

• SP 1.4. Def<strong>in</strong>e how measures will be analyzed and<br />

reported.<br />

Pg. 43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!