Measurement in the Capability Maturity Model Integration (CMMI)
Measurement in the Capability Maturity Model Integration (CMMI)
Measurement in the Capability Maturity Model Integration (CMMI)
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>CMMI</strong> <strong>Model</strong>s<br />
<strong>Measurement</strong> <strong>in</strong> <strong>CMMI</strong><br />
Staged and Cont<strong>in</strong>uous Representations (with<br />
recommended stag<strong>in</strong>g) of:<br />
• Software Eng<strong>in</strong>eer<strong>in</strong>g<br />
• Systems Eng<strong>in</strong>eer<strong>in</strong>g<br />
• Software+Systems Eng<strong>in</strong>eer<strong>in</strong>g<br />
• Software+Systems Eng<strong>in</strong>eer<strong>in</strong>g with IPPD<br />
Validated<br />
RCP<br />
Delayed<br />
CCB<br />
package<br />
Rejected<br />
contractor<br />
cost<br />
proposal<br />
OASB m<strong>in</strong>utes OARB m<strong>in</strong>utes<br />
21ST SW<br />
21-10401<br />
PERFORM VCN<br />
ANALYSIS<br />
Release Factors<br />
2.1.1<br />
CONSULT WITH Informal assessment<br />
SOFTWARE IPT of Release Factors<br />
2.1.2<br />
PREPARE<br />
CCB<br />
PACKAGE<br />
2.1.3<br />
CCB package template<br />
Best<br />
Practices<br />
CCB package<br />
PREPARE ACQUISITION<br />
STRATEGY BRIEFING<br />
2.1.4<br />
Acquisition<br />
strategy brief<strong>in</strong>g<br />
CONDUCT<br />
ACQUISITION<br />
STRATEGY<br />
2.1.5<br />
Sensor IPT<br />
Mystic Algorithms<br />
Validated RCP PREPARE AND Draft VCN<br />
COORDINATE<br />
DRAFT VCN<br />
Approved<br />
2.1.6<br />
acquisition<br />
strategy<br />
NODE: TITLE: NUMBER:<br />
PLAN PROJECT<br />
2.1<br />
Pg. 63